A82 Ba Bridge Replacement

  • Status Completed

A survey identified the A82 Ba Bridge as being under strength to carry future traffic loads and it was replaced by a stronger structure. A 52 week contract, awarded in January 2010 to RJ McLeod, was completed ahead of schedule in December 2010.

View the A82 Ba Bridge Replacement details