Close Menu

  • A9 Tomatin to Moy

    In Preparation

    More details of this process can be found on: http://www.transportscotland.gov.uk/road/a9-dualling-strategy

  • A9 Tay Crossing to Ballinluig

    In Preparation

    More details of this process can be found on: http://www.transportscotland.gov.uk/road/a9-dualling-strategy

  • A830 Dearg Bridge Replacement

    Complete

    Transport Scotland replaced the old life expired A830 Dearg Bridge over the Dearg watercourse 4 mile west of Glenfinnan with a new wider bridge designed to modern standards.

  • A830 Garbh Bridge Replacement

    In Preparation

    This is a scheme to replace the existing life expired A830 Garbh Bridge over a watercourse 5 miles west of Glenfinnan. The bridge works will be undertaken by Transport Scotland’s Operating Company BEAR Scotland Ltd. Work will commence in April 2015 for a period of 9 months.

  • A830 Utha Bridge Replacement

    In Preparation

    This is a scheme to replace the existing life expired A830 Utha Bridge over a watercourse 2 miles west of Glenfinnan. The bridge works will be undertaken by Transport Scotland’s Operating Company BEAR Scotland Ltd. Work will commence in April 2015 for a period of 9 months.

  • A68 Lintalee Retaining Wall Remedial Works

    In Preparation

    Why is it needed?

  • A898 Erskine Bridge Lighting and Electrical Refurbishment

    Complete

    What's involved?

    The contract delivered the refurbishment of the original lighting and electrical systems associated with the bridge. The works included:

  • A720 Sheriffhall Roundabout

    In Preparation

    Sheriffhall Roundabout is a key junction on the A720 Edinburgh City Bypass and connects to six A-class roads of local and regional importance, namely the A7 (north), the A6106 Millerhill Road, A720 (East), the A6106 Old Dalkeith Road, A7 (south), and A720 (west).

  • A9/A96 Connections Study

    Complete

    The A9 / A96 Connections Study looked at the problems, opportunities and issues concerning traffic travelling between Inshes, Raigmore and Longman junctions in Inverness in an effort to develop a potential solution to the congestion and journey time reliability issues that exist at these key junctions.

  • A9 Berriedale Braes improvement scheme

    In Preparation

    This scheme is on the A9 in Caithness, north of Helmsdale and south of Dunbeath and its purpose is to remove the hairpin bend and improve the alignment.

  • A82 Wellington Lay-By Allt Cumhang Wall

    In Preparation

    This lay-by is a popular stopping point for tourist traffic providing drivers with a convenient location from which to view the Loch Ness.  These improvements will allow the lay-by to be fully re-opened to traffic and ensure its long term durability.  A feasibility study is underway to determine the best solution.

  • A9 Clunie Bridge deck refurbishment

    Complete

    During 2012 Transport Scotland carried out essential repairs to the A9 Clunie Bridge. The bridge was refurbished to current standards, offering improved safety for trunk road users. The improvements ensured its future durability.

Pages

Scroll to top