2102 Publications
Filter by:
Community Needs Assessment Methodology
24 Sep 2025Transport Scotland is currently developing the Islands Connectivity Plan, which will replace the Ferries Plan 2013-2022. Central to this will be a set of Community Needs Assessments. This paper shows the approach to conducting these Community Needs Assessments.
A92 Cardenden Viaduct Southbound - Environmental Record of Determination
24 Sep 2025Determination of the need for an Environmental Impact Assessment, as required by the 2017 amendment (Environmental Impact Assessment Regulations) to The Roads (Scotland) Act 1984.
SQUIRE performance report - Period five 2025/26 - ScotRail
24 Sep 2025SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.
SQUIRE performance report - Period five 2025/26 - Caledonian Sleeper
24 Sep 2025SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.
A68 Galadean Bridge Deck Refurbishment - Environmental Impact Assessment Record of Determination
24 Sep 2025Determination of the need for an Environmental Impact Assessment, as required by the 2017 amendment (Environmental Impact Assessment Regulations) to The Roads (Scotland) Act 1984.
Minutes - 9 July 2025 - National Transport Strategy (NTS) Board
24 Sep 2025Minutes from the National Transport Strategy (NTS) Board on 9 July 2025.
A Further Letter from the Minister for Agriculture and Connectivity to the chair of the Cowal Transport Forum
23 Sep 2025A letter from the Minister for Agriculture and Connectivity to the Chair of the Cowal Transport Forum confirming the decision to remove three return sailings.
DMRB Stage 1 Report - A75 Springholm and Crocketford Improvements
22 Sep 2025Design Manual for Roads and Bridges Stage 1 Assessment for the A75 Springholm and Crocketford Improvements scheme.
DMRB Stage 1 Environmental Appraisal Report - A75 Springholm and Crocketford Improvements
22 Sep 2025Design Manual for Roads and Bridges Stage 1 Environmental Appraisal Report for the A75 Springholm and Crocketford Improvements scheme.
Strategic Assessment Report - A75 Springholm and Crocketford Improvements
22 Sep 2025Strategic Assessment Report for the A75 Springholm and Crocketford Improvements scheme.