A87 Trunk Road Structural Maintenance Schemes: EIR release

  1. All reports and documents prepared by the roads maintenance team, including those held by contractors, in respect of the clean up operation following our client's accident;
  2. All reports prepared by the roads maintenance team, including those held by contractors, in respect of oil spills along this stretch of road in the period 27/09/2017 to date;
  3. All road traffic accidents reported to have taken place along this stretch of road in the period of 27/09/2017 to date;
  4. All work carried out by Transport Scotland, or their agents, along this stretch of road in the period of 27/09/2017 to date;
  5. All complaints regarding this section of road made to Transport Scotland, or their agents, in the period of 27/09/2017 to date;
  6. Information on all proposed work to be carried out by Transport Scotland, or their agents, along this section of road;
  7. All investigatory material and reports relative to skid resistance surveying on this stretch of road in the period of 27/09/2017 to date;
  8. Transport Scotland's decision making criteria with respect to when skid resistance surveying is required – with specific regard to the number of accidents required before the surveying is carried out;
  9. All information relative to the decision as to the installation of warning signs on this road in August, September and October 2017;
  10. All reports and documents prepared by the roads maintenance team, including those held by contractors, in respect of the clean up operation following our client's accident while driving vehicle registration SK08 CNN;
  11. All road traffic accidents reported to have taken place on this stretch of road within the period of 01/01/2017 to date.

Full response and associated documentation available at:


Published Date 30 Jan 2018 Subject Mode of transport