FRC Studies and Reports (2008 - 2011)

This document library section features information on studies and reports published between 2008 and 2011. 

Engaging with communities: Construction

Description: Document outlining how the public and stakeholders can get information and provide feedback on the Forth Replacement Crossing.

Publication Date: September 2011

FRC Final Local Area Paramics Modelling Audit Report

Description: A report presenting the findings of the Traffic and Transport Advisor and Auditor's (TTAA's) review of the development of the local area models used to assess the local traffic, economic, operational and environmental impacts of the FRC.

Publication Date: May 2011

South Queensferry Cutting Rev 2

Description: A technical report assessing potential groundwater effects resulting from the proposed South Queensferry cutting.

Publication Date: February 2011

South Queensferry Cutting Report

Description: Appendix A, B & C Drawings.

Publication Date: February 2011

Public Transport Strategy

Description: Public Transport Strategy prepared in support of the Forth Replacement Crossing.

Publication Date: July 2010

Queensferry Junction: Technical Assessment Summary Report

Description: A summary of the technical assessment work to inform and confirm the decision to reposition Queensferry Junction to the west of South Queensferry.

Publication Date: May 2010

Sustainability Appraisal & Carbon Management Report

Description: A report setting out defined objectives and sustainable design measures with the aim of delivering a more sustainable scheme.

Publication Date: November 2009

Health Impact Assessment

Description: A report presenting an appraisal of the possible health effects of the proposed scheme.

Publication Date: November 2009

Design Manual for Roads & Bridges Stage 3 Engineering Report

Description: Engineering description and assessment of the scheme.

Publication Date: November 2009

Consultation & Engagement Report

Description: A report documenting the consultation and engagement activities which were undertaken during the development of the scheme.

Publication Date: November 2009

Public Information Exhibitions - Feedback and Outcomes Report - Appendix to the June 2009 Report

Description: This Appendix to the June 2009 report provides responses to the issues raised which were not covered by the responses to the common or repeated points of feedback in the June 2009 report.

Publication Date: November 2009

Update August 2009

Update August 2009 high-definition version (6.94 MB)

Description: August 2009 edition of the Forth Replacement Crossing newsletter.

Publication Date: August 2009

Forth Replacement Crossing: Guidance on the Parliamentary Process, Compulsory Purchase Process and Compensation

Description: This guide provides information and advice about the statutory procedures that the Scottish Ministers and Transport Scotland propose to follow for the compulsory purchase process.

Publication Date: July 2009

Public information exhibitions - feedback and outcomes report

Description: This report documents the feedback received at public exhibition events held in January 2009, explains how this has been, or is being, taken into account and describes the outcomes of the consultation.

Publication Date: June 2009

Update April 2009

Update April 2009 high-definition version (4.41 MB)

Description: April 2009 edition of Forth Replacement Crossing newsletter.

Publication Date: April 2009

Update January 2009 high definition version (5 MB)

Description: January 2009 edition of Forth Replacement Crossing newsletter.

Publication Date: January 2009

Sustainable Development Policy

Description: The Forth Replacement Crossing’s Sustainable Development policy has been developed to harmonise with five key principles that underpin Scotland’s National sustainable development policy.

Publication Date: January 2009

Update December 2008

Description: December 2008 edition of Forth Replacement Crossing newsletter.

Publication Date: December 2008

Engaging With Communities

Description: Document outlining how the public and stakeholders can get information and provide feedback on the Forth Replacement Crossing.

Publication Date: September 2008

Update September 2008

Update September 2008 high-definition version (1.22 MB)

Description: September 2008 edition of Forth Replacement Crossing newsletter.

Publication Date: September 2008

Update July 2008 high-definition version (770 kb)

Description: July 2008 edition of Forth Replacement Crossing newsletter.

Publication Date: July 2008

Update April 2008

Update April 2008 high-definition version (571 kb)

Description: April 2008 edition of Forth Replacement Crossing newsletter.

Publication Date: April 2008

Information leaflet - update

Description: An information leaflet listing key milestones that have been achieved on the project since the announcement in December 2007 that the Forth Replacement Crossing will be a multi-modal cable stayed bridge.

Publication Date: April 2008

Environmental surveys and ground investigations

Description: An information leaflet for landowners.

Publication Date: March 2008

Environmental surveys and ground investigations-information for landowners

Description: Information leaflet about environmental surveys and ground investigations for the Forth Replacement Crossing.

Publication Date: March 2008