A725 Northbound: maintenance policy, repair history, safety inspections: EIR release

I am writing to request information under the Freedom of Information Act relating to a road your authority is responsible for maintaining. Specifically, my query relates to the A725 Northbound, 100 metres prior to Westbound slip road on the 30/03/2016 (your reference from previous correspondence TPC/SRP/2015/0095).

Please can you send me:

1. A copy of your current road maintenance policy relating to that road. Please send me the full policy, but this should include details of the intended frequency of road safety inspections, how these inspections should be conducted and the maximum time between identification of a defect and repairs being carried out.

2. A copy of the road repair history for that road over the past year. Again, please send me the full road repair history, but this should include: - dates of all safety inspections between 30/01/2016 - details of how safety inspections were undertaken (walked or driven, speed of inspection vehicle etc) - details of all carriageway defects identified, with description, date and time - details of how the authority handled these defects, what repairs were undertaken and the time between the identification of each defect and a repair being carried out.

The request was clarified for point number 2:

The dates for the dates of all safety inspections between 30/01/2016 are between 30/01/2016 - 30/03/16. This is for the 12 months prior to 30/03/2016.

Full response and associated documentation available at:


Published Date 27 Mar 2018 Subject Mode of transport