A83 at Cairndow: road inspection reports: EIR release

We refer to the above and would be grateful if you would provide us with the following information relating to the A83, Cairndow. The road is parallel to the service road which leads to the Cairndow Stagecoach Inn. We have enclosed map to point the exact section of the carriageway. To narrow the search, we would be happy to restrict the information to 500 metres either side of location.

1. Details of the owners of occupiers of the A83, Cairndow in the period of 10 August 2015 to date;

2. Details of all works carried out by Transport Scotland or BEAR Scotland, planned or otherwise, on the A83, Cairndow (as per the map) in the period of 10 August 2015 to date;

3. Details of the categorisation of hazard for defects in drainage and/or flooding on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date and specifically confirm the definition of a Category 1 or 2H defect;

4. Details of any complaints received, in any form, about defects or damage to drainage and/or flooding on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date;

5. Details of any accidents caused by defects, flooding and/or drainage on the A83 Cairndow (as per the map) in the period of 1 August 2015 to date;

6. Details of reported flooding on the A83, Cairndow (as pr the map) in the period of 1 August 2015 to date.

7. Details of investigations into the drainage on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date.

8. Details of all inspections, including date and time of those inspections, inspection route and manner in which the inspections are carried on the drainage on the A83, Cairndown (as per the map) in the period of 1 August 2015 to date;

9. Details or guidance on the timescale within which repairs to defects, drainage and/or flooding are carried out on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date;

10. Details of all maintenance and repairs, including works instructed and finally completed, to defects, drainage and/or damage on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date;

11. Details of all correspondence to independent contactors, utility companies or any other 3rd parties relating to work carried out by them, including the location of such works on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date;

12. Details of all correspondence to and from Transport Scotland to third parties requesting repair to defects, drainage and/or flooding or damage on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date.

13. Details of the specification of the drain in situ at the time, including the size/diameter of the pipes on the A83 Cairndown, (as per the map) in the period of 1 August 2015 to date.

14. Details of the same specification of pipes and drainage plan for after the road resurfacing on the A83, Cairndow (as per the map).

15. Details of regular cleaning or dredging of the drains on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date.

16. Details of any road-surfacing carried out on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date.

17. A map showing the layout of the drain on the A83, Cairndow (as per the map) in the period of 1 August 2015 to date.

18. Information about the water table on the A83, Cairndown (as per the map) in the period of 1 August 2015 to date.’

Full response and associated documentation available at: