A90 Foveran culvert maintenance records, construction drawings and correspondence: EIR release

You asked for

“Construction drawings for the replacement culvert and associated works at Foveran (Old A90) which commenced on 2 September 2019.

Proposed embankment repairs at the corner of Blairythan Terrace/old A90.

Maintenance records for the A90 Foveran culvert between September 2009 and January 2016.

Copy of the Detailed Drainage Study and Geotechnical Study and any other reports carried out by TS relative to the A90 Foveran culvert between 2009 and 2019.

Details of the temporary works carried out at Foveran in April/May 2016. Bear Scheme Id Ref: 14/NE/01310/012.

Any correspondence/telephone conversations/reports/investigations/recommendations between Aberdeenshire Council and Bear/Transport Scotland relative to the A90 Foveran culvert between 2009 and 2019.

Any correspondence/telephone conversations/meetings and emails between Bear and myself with respect to the culvert and associated works.”

Clarification was received on 17 January that you “would request a detailed programme/scope of the works carried out to upgrade the drains/chambers on th A90 and Blairythan Terrace, Foveran.”

Also requested – “detailed scope of works for the temporary works and a copy of the invoice/receipt for the works carried out to our property”.

Full response and associated documentation available at:


Published Date 17 Feb 2020 Subject Mode of transport