Dalmuir train station - maintenance and repairs: FOI release
- Who is responsible for the maintenance of the enclosed corridor leading to Platform 5 at Dalmuir Train Station?
- What is the inspection interval for the enclosed corridor leading to Platform 5 at Dalmuir Train Station?
- Please provide us with the details of inspections conducted during a period of 05/08/2017 – 05/08/2019.
- Please advise whether there were any complaints made about any defects within the enclosed corridor leading to Platform 5 at Dalmuir Train station in a period of 05/08/2017 – 05/08/2019. If so, please provide us with details of said complaints.
- Details of any repairs undertaken to the enclosed corridor leading to Platform 5 at Dalmuir Train station for a period of 05/08/2017 – 05/08/2019
Full response and associated documentation available at: