Drainage drawings for M74 extension at Junction 2 in Rutherglen: EIR release

“I write on behalf of Babcock International to request a particular section of the as fitted drainage drawings/installation that were constructed as part of the M74 extension directly adjacent to our depot at Rutherglen.

Babcock hold BSI accreditation for the depot, part of the accreditation includes being able to demonstrate/prove our discharge from the site from an environmental perspective, to do this we need the above information.

I have attached an aerial snapshot of the area in question, however should you require any more information please do not hesitate to make contact.

I would be obliged if you can furnish me with the details as requested above as soon as possible.”

Full response and associated documentation available at: