Inspection report on M8 at Kingston Bridge: EIR release

1. Copy of inspection report on M8 at Kingston Bridge carried out on 6/2/18 by Scotland Transerv.

2. Details of how inspection was carried out (ie on foot or in moving vehicle).

3. If inspection was carried out from a moving vehicle, which lane and what speed was the vehicle travelling in.

4. The weather condition at time of inspection.

Full response and associated documentation available at: