Maintenance and Inspection Schedule for the M898 Trunk Road: EIR release
- A copy of the Maintenance and Inspection Schedule for the M898 Trunk Road (South bound) carriageway towards Glasgow/Renfrew from 1st February 2018 to 5th February 2019
- Details and dates of all carriageway defects identified during safety inspections during these dates.
- The time period adopted between identification and repair of carriageway defects (namely potholes)
- Details of all complaints and or enquiries made in relation to road damage/ potholes on this trunk road during this time frame
Full response and associated documentation available at:
Published Date
20 Mar 2019
Subject
Mode of transport