Maintenance and Inspection Schedule for the M898 Trunk Road: EIR release

  1. A copy of the Maintenance and Inspection Schedule for the M898 Trunk Road  (South bound) carriageway  towards Glasgow/Renfrew from 1st February 2018 to 5th February 2019
  2. Details and dates of all carriageway defects identified during safety inspections during these dates.
  3. The time period adopted between identification and repair of carriageway defects (namely potholes)
  4. Details of all complaints and or enquiries made in relation to road damage/ potholes on this trunk road during this time frame

Full response and associated documentation available at:


Published Date 20 Mar 2019 Subject Mode of transport