Testing results for recent A83 Castleton to Kilmory scheme: EIR release
Information requested
You asked for "test results for material laid (grading, bitumen content etc) for the A83 Castleton recent resurfacing including all temperatures taken from loads when arrived on Site and all temperatures of material being laid."
Full response and associated documentation available at: