Appendix 13 Water Quality Prediction
Appendix 13 Water Quality Prediction
This section is also available in pdf format (160k)
Proposed Scheme.
Water Quality Prediction |
Proposed Road Configuration |
29/11/2007 |
||
---|---|---|---|---|
Leader Water |
Headshaw Burn |
|||
E.Q.S. Level - copper |
mg/l |
3.0 |
3.0 |
Data from S.E.P.A. |
E.Q.S. Level - zinc |
mg/l |
15.0 |
15.0 |
Data from S.E.P.A. |
Area of road (A) |
ha |
2.08 |
0.91 |
13m wide road * |
Runoff Coefficient (R) |
0.5 |
0.5 |
Section A.3.ii, Annex 1, Part 10, DMRB Vol. 11. |
|
Rainfall Depth (D) |
mm/d |
13 |
13 |
Figure A.1, Annex 1, Part 10, DMRB Vol. 11. |
Q95 |
m3/s |
0.087 |
0.043 |
Data from S.E.P.A. |
CB - copper - upstream |
kg/m3 |
0.0015 |
0.0015 |
Based on Leader Water Data of same river quality |
CB - zinc - upstream |
kg/m3 |
0.0075 |
0.0075 |
Based on Leader Water Data of same river quality |
Runoff Volume (VH) |
m3/day |
135.2 |
59.2 |
Runoff Volume=(A x R x D/1000) x10000 |
Q95 (VR) |
m3/day |
7516.8 |
3749.8 |
95 percentile flow m3/day (Q95 x 3600seconds x 24hrs) |
Dilution |
55.6 |
63.4 |
(VR / VH) - Section A3 (iv), Annex 1, HA 216/06. |
|
AADT |
veh/day |
11748 |
11748 |
From Stage 3 Traffic & Economic Assessment - Design Year (2025) Flows |
Bulid up rate - Copper |
kg/ha/yr |
0.3 |
0.3 |
Table B.1, Annex 1, Part 10, DMRB Vol. 11. |
Bulid up rate - Zinc |
kg/ha/yr |
1.0 |
1.0 |
Table B.1, Annex 1, Part 10, DMRB Vol. 11. |
Mcu |
kg/5day |
0.0085 |
0.0037 |
Five day Pollutant build-up Copper |
CR - soluable copper |
kg/m3 |
0.0026 |
0.0025 |
CR = {(CB x VR)+(1000 x M)} / (VR x VH) |
CR - soluable copper |
mg/l |
2.6 |
2.5 |
Down stream river concentration of copper in micrograms per litre µg/l |
Mzn |
kg/5day |
0.028 |
0.012 |
Five day Pollutant build-up Zinc |
Cr - zinc |
kg/m3 |
0.0111 |
0.0107 |
CR = {(CB x VR)+(1000 x M)} / (VR x VH) |
Cr - zinc |
mg/l |
11.1 |
10.7 |
Down stream river concentration of zinc in micrograms per litre µg/l |
A68
*Area of road drained into Headshawn Burn = {(Ch1+45 to Ch2+50) x 11.75m wide road + (Ch2+50 to Ch7+35) x 13.5m wide road}/10,000m2
*Area of road drained into Leader Water = {(Ch7+35 to Ch18+30) x 13.5m wide road + (Ch18+30 to Ch21+55) x 12.75m}/10,000m2
New Side Road
*Area of road drained into Headshawn Burn = {(Ch700 to Ch1000) x 4m wide road}/10,000m2
*Area of road drained into Leader Water = {(Ch0 to Ch700) x 4m wide road}/10,000m2
Existing Scheme.
Water Quality Prediction |
Existing Road Configuration |
29/11/2007 |
||
Leader Water |
Headshaw Burn |
|||
E.Q.S. Level - copper |
mg/l |
3.0 |
3.0 |
Data from S.E.P.A. |
E.Q.S. Level - zinc |
mg/l |
15.0 |
15.0 |
Data from S.E.P.A. |
Area of road * (A) |
ha |
1.06 |
0.54 |
13m wide road * |
Runoff Coeficient (R) |
0.5 |
0.5 |
Section A.3.ii, Annex 1, Part 10, DMRB Vol. 11. |
|
Rainfall Depth (D) |
mm |
13 |
13 |
Figure A.1, Annex 1, Part 10, DMRB Vol. 11. |
Q95 |
m3/s |
0.087 |
0.043 |
Data from S.E.P.A. |
CB - copper - upstream |
kg/m3 |
0.0015 |
0.0015 |
Based on Leader Water Data of same river quality |
CB - zinc - upstream |
kg/m3 |
0.0075 |
0.0075 |
Based on Leader Water Data of same river quality |
Runoff Volume |
m3/day |
68.9 |
35.1 |
Runoff Volume=(A x R x D/1000) x10000 |
Q95 |
m3/day |
7516.8 |
3749.76 |
95 percentile flow m3/day (Q95 x 3600seconds x 24hrs) |
Dilution |
109 |
107 |
(VR / VH) - Section A3 (iv), Annex 1, HA 216/06. |
|
AADT |
veh/day |
11748 |
11748 |
From Stage 3 Traffic & Economic Assessment - Design Year (2025) Flows |
Build up rate - Copper |
kg/ha/yr |
0.3 |
0.3 |
Table B.1, Annex 1, Part 10, DMRB Vol. 11. |
Build up rate - Zinc |
kg/ha/yr |
1.0 |
1.0 |
Table B.1, Annex 1, Part 10, DMRB Vol. 11. |
Mcu |
kg/5day |
0.0044 |
0.0022 |
Five day Pollutant build-up Copper |
CR - soluable copper |
kg/m3 |
0.0021 |
0.0021 |
CR = {(CB x VR)+(1000 x M)} / (VR x VH) |
CR - soluable copper |
mg/l |
2.1 |
2.1 |
Down stream river concentration of copper in micrograms per litre µg/l |
Mzn |
kg/5day |
0.015 |
0.007 |
Five day Pollutant build-up Zinc |
Cr - zinc |
kg/m3 |
0.0093 |
0.0094 |
CR = {(CB x VR)+(1000 x M)} / (VR x VH) |
Cr - zinc |
mg/l |
9.3 |
9.4 |
Down stream river concentration of zinc in micrograms per litre µg/l |
*Area of road drained into Headshawn Burn = {(Ch1+45 to Ch5+50) x 10m wide road + (Ch5+50 to Ch7+35) x 7.3m}/10,000m2
*Area of road drained into Leader Water = {(Ch7+35 to Ch21+00) x 7.3m wide road + (Ch21+00 to Ch21+55) x 12m}/10,000m2