Description of main environmental impacts and proposed mitigation

Air quality

Construction activities have the potential to generate short-term, localised air quality impacts. Dust and fine particulate emissions will be generated during the works, from activities such as milling of the carriageway surface and verges. The presence of increased HGVs and construction plant presence may contribute to short-term exhaust emissions. TM will likely cause congestion and elevated traffic-related emissions during the works.

No likely significant effects are anticipated due to the nature and scale of the works. All air quality effects will be temporary, limited to the construction phase and localised. Following completion of the works, there will be no changes to traffic flow characteristics (composition, speed or flows).

Mitigation measures will follow best practice from the Institute of Air Quality Management (IAQM), from the ‘Guidance on the assessment of dust from demolition and construction (January 2024)’ including:

  • Site layout will be planned (including plant and vehicles) so that machinery and dust causing activities are located away from receptors, as far as reasonably practicable.
  • Materials that have a potential to produce dust, such as road planings and excavated verge material will be removed from site as soon as possible (cover or fence stockpiles to prevent wind whipping).
  • Drop heights from conveyors and other loading or handling equipment will be minimised.
  • Vehicles entering and leaving the work area will be covered/sheeted to prevent escape of materials during transport.
  • Equipment will be readily available on site to clean any dry spillages and clean up spillages as soon as reasonably practicable after the event using wet cleaning method.

The following additional mitigation measures will be implemented:

  • When not in use, plant and vehicles will be switched off and there will be no idling vehicles.
  • All plant and fuel-requiring equipment used during construction will be well maintained to minimise emissions.

No significant air quality effects are anticipated. Therefore, in line with DMRB Guidance document LA 105: Air quality no further assessment is required.

Cultural heritage

The proposed works are restricted to resurfacing, and minor verge works within the existing A77 carriageway boundary. As works will be confined to the previously disturbed ground with no land take or excavations of undisturbed ground, no impacts on known or potential archaeological remains are expected.

Two statutory heritage features lie within 300m, with one, a listed bridge located approximately 8m from the scheme, adjacent to the A77 Monkwood Bridge and spanning the River Doon. However, the works are limited in extent, temporary in nature and will not alter the character, landscape or appreciation of the statutory designation. Therefore, no impacts on the cultural significance of the assets anticipated.

There are 15 records on the HER and NRHE database within 200m, with none located within the scheme extents. The works are not expected to result in any adverse impacts to the records.

There will be no changes to the road alignment or land take, with no lasting changes to views or quality, and therefore no operational impacts on cultural heritage.

The following mitigation measures will be in place:

  • Plant and machinery will be stored within the carriageway boundary where practicable.
  • Any access beyond the carriageway will be minimised and ideally limited to foot access.
  • Site operatives will be made aware of the location of the designated assets within 300m, with no storage of plant, vehicles, machinery within proximity to the designated assets.

No significant effects are anticipated to cultural heritage. Therefore, in line with DMRB Guidance document LA 106: Cultural heritage assessment, no further assessment is required.

Landscape and visual effects

The works involve resurfacing of the existing carriageway, and verge works comprising upgrading VRS, filter drains and lay-by and footway surfacing.

The completed scheme will not result in the introduction of notable new visual features or landscape change and will not detract from overall landscape quality or distinctiveness. As such, no significant landscape or visual effects are anticipated.

Visual impacts will be limited and temporary. Stationary visual receptors are likely to experience close and direct, yet short-term views of the works, including artificial lighting and construction presence. However, effects will be limited as all activities are to take place overnight for approximately two-weeks.

Three areas of AWI woodland are located adjacent to the scheme extents. As all works will be restricted to the existing carriageway and immediate verge, and no vegetation clearance is required, there is no anticipated impact to the woodland areas.

The following mitigation measures will be in place:

  • The site will be kept clean and tidy throughout all stages of the works, with appropriate storage of materials, equipment, plant and waste.
  • Works will avoid encroaching on land and areas where work is not required or not permitted, including for storage and parking.
  • Directional site lighting will be used to minimise visual impacts.

No significant effects are anticipated upon the landscape and visual effects. Therefore, in line with DMRB Guidance document LA 107: Landscape and visual effects no further assessment is required.

Biodiversity

Construction activities have the potential to cause temporary adverse impacts on biodiversity due to vehicle presence, noise and artificial site lighting during the night-time works. These may disturb protected species within the scheme surroundings.

Excavation works within the verge have the potential to spread INNS, injurious weeds or target species that may be present along the verge. As such, the following measures will be implemented during the works, to avoid the risk of spread:

  • No works will be carried out within appropriate buffer zones of the INNS identified. Where this is not possible, method statements will be prepared by a qualified ecologist prior to the works and adhered to on site.
  • Any access beyond the carriageway surface will be limited to only that required to facilitate any verge works. Biosecurity measures will be in place including the inspection and cleaning of footwear, plant and machinery.
  • Site operatives will be briefed on Amey’s Invasive Plants environmental briefing prior to the works.

Drainage infrastructure and surrounding watercourses pose a potential pathway to pollute aquatic habitats, particularly during milling operations and periods of heavy rainfall (see Road Drainage and the Water Environment section for further details).

No lasting impacts are anticipated, as the scheme will not alter or fragment any habitats, or introduce new lighting features.

The following mitigation measures will be adhered to:

  • A ‘soft start’ procedure with regard to plant, machinery and vehicles will be implemented daily to gradually increase noise levels and minimise disturbance.
  • Directional site lighting will be used, aimed away from sensitive ecological features such as woodland and watercourses.
  • If a protected species is encountered, works will be paused and advice sought from Amey’s Ecology Team.
  • Additional pollution prevention measures are detailed in the Road Drainage and the Water Environment section.

With these mitigation measures in place, no significant effects are predicted for biodiversity. Therefore, in line with DMRB Guidance document LA 108: Biodiversity no further assessment is required.

Geology and soils

There is potential for minor and temporary disturbance of superficial soils during excavation works within the verge. Exposed soils may be vulnerable to accidental pollution incidents through spillage of fuels or oils. The use of heavy plant and machinery such as excavators within the soft estate may result in localised soil compaction, affecting soil structure and permeability within the immediate working area.

Given that the proposed works are limited to carriageway resurfacing and minor verge works within localised stretches, no significant impacts on geology and soils are anticipated.

The following mitigation measures will be implemented:

  • Excavated soils will be re-used on site as far as reasonably practicable, i.e. for backfilling. 
  • Appropriate grass reinstatement will be carried out on completion of the works.
  • Appropriate dust control measures will be implemented during construction to minimise the risk of dust deposition on adjacent soils during verge works. This will include, damping down exposed surfaces and excavated materials during dry and windy conditions. Where there are temporary stockpiles of soils, filter stones and other granular material, these will be appropriately managed and retained on site for the shortest practicable duration to reduce the potential for windblown dust.
  • Vehicles will not be stored or parked on grass verges to reduce the risk of soil compaction and contamination from accidental leaks or spills.

Additional measures are detailed in within the Road Drainage and Water Environment section.

No operational impacts to geology and soils are anticipated as the scheme will not have any ongoing effects or disturbance to geology or soils.

With mitigation measures in place, no significant effects are anticipated on geology and soils. Therefore, in line with DMRB Guidance document LA 109: Geology and soils no further assessment is required.

Material assets and waste

There is potential for resource depletion through the use and transportation of primary materials such as aggregates. However, the use of HMA provides long-term durability, extending the design life of the carriageway and reducing the frequency of future resurfacing interventions.

Potential impacts related to pollution from materials and waste may result if these are not appropriately managed during construction. Therefore, the following regulatory requirements will be adhered to:

  • The Contractor is responsible for the management and disposal of road planings arising from the works. All waste will be managed in accordance with the Environmental Authorisations (Scotland) Regulations 2018, under the relevant SEPA waste authorisation for recovery, reuse or disposal. For example, uncontaminated road planings will be prioritised for recovery or reuse, through recycling into new asphalt, in line with the waste hierarchy. Landfill disposal will only be considered where recovery or reuse options are not available or practicable.
  • Waste will be transferred to SEPA-authorised facilities by carriers with valid waste carrier registrations. A waste transfer note (WTN) will be completed for removal of waste from site and retained for two years, in line with statutory Duty of Care requirements.
  • A Site Waste Management Plan (SWMP) is required as the scheme value exceeds £350,000. This will detail how resource use and waste arising from the works will be managed throughout the scheme. This will help control and reduce the amount of waste produced, resulting in less landfilled waste.

The following mitigation measures will be implemented:

  • Waste will be stored in suitable, covered containers, and segregated at the source where possible.
  • The waste hierarchy (Reduce, Reuse, Recycle and Dispose) will be employed throughout the construction works.
  • Good materials management methods (e.g., ‘just-in-time’ delivery) will be used to minimise and prevent the disposal of unused materials.
  • Containment measures will be in place to prevent debris or pollutants from entering the surrounding environment.
  • Operators will have a duty of care ensure the safe handling, storage, and transfer of waste. This includes maintaining proper documentation and ensuring that waste is only transferred to licensed carriers.

With best practice mitigation measures in place, no significant effects are predicted for materials and wastes. Therefore, in line with DMRB Guidance document LA 110: Material assets and waste no further assessment is required.

Noise and vibration

Construction activities, including milling and excavation and the operation of plant, machinery and construction vehicles may generate temporary increases in noise and vibration. TM and associated congestion may also contribute to short-term increases in traffic noise along the proposed diversion route, however, such effects will be brief and limited to the short construction period.

No adverse operational noise or vibration impacts are anticipated. The improved road surface and associated verge works will not change the traffic speed, flows or composition, and ambient noise levels are expected to return to pre-construction conditions or may be slightly reduced due to the improved surfacing. 

Mitigation measures follow Best Practicable Means as outlined in British Standard (BS) 5228:2009+A1:2014. The standard provides specific detail on suitable measures for noise control in respect to construction operations; for example:

  • Quiet working methods will be employed, including use of the most suitable plant, reasonable hours of working for noisy operations, and economy and speed of operations.
  • Effects from noise will be kept to a minimum through the use of appropriate mufflers and silencers fitted to machinery. All exhaust silencers will be checked at regular intervals to ensure efficiency.
  • Operations will be sequenced to minimise simultaneous use of high-noise equipment, and a ‘soft start’ to works will be in place, whereby plant, machinery and vehicles are started sequentially as opposed to simultaneously.
  • Plant and machinery will be regularly maintained to prevent excessive noise from worn parts or inefficient operation.
  • On-site construction tasks will be programmed to be as efficient as possible, with a view to limiting noise disruption to local sensitive receptors. Where night-works are to be undertaken, the noisiest works will be undertaken before 23:00 where possible.

The following further mitigation measures related to noise and vibration will be in place:

  • Delivery of Amey’s Noise and Vibration environmental briefing to all site operatives prior to the works.
  • Notification to South Ayrshire Council Environmental Health Team due to night-time programming.
  • Letter drops to NSRs to provide advance notification of the works and the programming schedule.
  • Pre-notification of the works through appropriate signage, and/or social media to inform local residents and road users of the upcoming works.

With best practice mitigation measures in place, no significant effects on noise and vibration are predicted. Therefore, in line with DMRB Guidance document LA 111: Noise and vibration no further assessment is required.

Population and human health

Construction activities may result in short-term disruption to road users through temporary TM, noise, delays, and increased journey times.

Direct access to properties will be maintained where the sole point of access is from within the scheme extents. Local residents and road users will be informed of the programme and duration of the works through letter drops, pre-construction notifications, social media release and signage on approach to scheme extents. South Ayrshire Council Environmental Health Team have also been notified of the works.

The layby within the scheme extents is likely to require temporary closure during the works, however, with no permanent change to access or provision post-construction.

Human health determinants such as noise, and air quality will likely experience temporary increases, however, due to the nature and scale of the works no discernible health impact is expected.

Where footway improvement works are required, short-term temporary closures of the footways along the scheme extents will be required. However, alternative provisions and/or signposted diversions will be implemented. The scheme does not permanently remove or sever any existing WCH routes or reduce connectivity to residential properties, businesses, agricultural land or community assets and land, and as such, no adverse long-term changes to WCH movement, community connectivity or population and human health are anticipated.

Please refer to the Landscape and Visual Effects section above for an assessment of the visual impacts to visual receptors.

With best practice mitigation measures in place, no significant effects on population and human health are anticipated. Therefore, in accordance with DMRB Guidance document LA 112: Population and human health, no further assessment is required.

Road drainage and the water environment

Construction activities may pose short-term pollution risks to the water environment through accidental spills of fuels, oils, chemicals, concrete wash water, or road planings which could enter surface runoff, drainage systems and nearby surface watercourses.

Two surface watercourses travel beneath the scheme extents, however, there will be no in-water works, abstraction or transfers of water from, or discharges to a waterbody, and therefore the potential for a pollution incident within a waterbody is unlikely.

The scheme lies within a groundwater DWPA; however, the works are limited to resurfacing of the existing carriageway and localised verge excavations not at depth to impact groundwater quality.

The works will not increase flood risk as there will be no increases in impermeable surface area. Replacement of the existing filter stone may provide a minor beneficial effect by improving the drainage system where localised siltation has occurred.

No other post construction impacts are anticipated.

The following best practice and pollution prevention and control measures will be in place:

  • All operatives will follow NetRegs Guidance for Pollution Prevention (GPP) documents.
  • All debris which has the potential to be suspended in surface water and wash into the local water environment will be cleaned from the site both during and following the works.
  • All site operatives will be made aware of site spillage response procedures and in the event of a spill all works associated with the spill will stop, and the incident reported. Spill kits will also be available within all site vehicles and spill kits will be replenished on site when required.
  • The Amey control room will be contacted if any pollution incidences occur (24 hours, 7 days a week).
  • In the event of a pollution incident, SEPA will be notified without delay.
  • Where possible, biodegradable lubricant and biodegradable hydraulic oil in plant will be used.
  • Weather reports will be monitored prior to and during the works with all construction activities temporarily halting in the event of adverse weather or a flooding event. The works will only continue when it is deemed safe to do so and runoff/ drainage can be adequately controlled to prevent pollution.
  • All storage areas (fuels, machinery, plant, materials) where required will be located and stored:
  • Away (>10m) from surface water drainage systems; and
  • Away from areas that see high vehicular movement (as far as reasonably practicable) to prevent damage by collision or extremes of weather.
  • Fuels stored within a drip tray, bund or other form of secondary containment with at least 110% of the maximum volume of a single container.
  • Where refuelling on site is required, there will be designated refuelling areas, located more than 10m from surface water drainage systems, and within hard standing and bunds to prevent leaks or spills escaping.
  • Concrete mixing and washing areas will be located within a designated, impermeable area and at least 10m from surface watercourses and drainage systems.
  • Delivery of Amey’s Water Pollution Prevention environmental briefing to all site operatives prior to the works.

With mitigation measures in place, no significant effects are anticipated on the water environment. Therefore, in line with DMRB Guidance document LA 113: Road drainage and the water environment no further assessment is required.

Climate

The use of HMA provides long-term durability, extending the design life of the carriageway and reducing the frequency of future resurfacing interventions. This can result in lower whole-life GHG emissions by reducing the demand for construction materials transportation and maintenance activities over the lifespan of the carriageway.

Construction activities may result in GHG emissions from vehicles, machinery, material production, and transportation. However, given the nature of the scheme, the volume of materials required to be imported on site is low, reducing the overall impact.

The following mitigation measures will be in place:

  • Where possible, materials and suppliers will be sourced locally to reduce GHG emissions associated with travel distance.
  • Waste disposal will be directed to local licensed facilities.
  • Plant, machinery and vehicles will not be left idling when not in use.
  • Further actions and considerations for this scheme are detailed in the above Material Assets and Waste section.

With best practice mitigation measures in place, no significant effects are anticipated on Climate. Therefore, in line with DMRB Guidance document LA 114: Climate, no further assessment is required.