Project details

Description

BEAR Scotland has been commissioned by Transport Scotland to carry out rock slope stabilisation works on six slopes (Slope 1-6) of varying length located adjacent to a 500m stretch of the A82 carriageway in Glen Coe (see Figures 1 & 2 below). These works are required to stabilise the rock slopes due to previous instances of rockfall. Stabilisation works will involve light rock scaling to a depth of around 10cm, and vegetation clearance at all slopes as well as other activities (see Table 1 below).

Table 1 – Slope lengths and specific activities

Slope

Length (m)

Vegetation Removal

Scaling

Netting

Reprofiling

Slope 1

128

Yes

Yes

Yes

No

Slope 2

43

Yes

Yes

No

No

Slope 3

100

Yes

Yes

No

Yes

Slope 4

58

Yes

Yes

Yes

No

Slope 5

95

Yes

Yes

Yes

No

Slope 6

85

Yes

Yes

No

No

Works are currently programmed to begin in late November 2025 for a duration of approximately eighteen weeks following a daytime working pattern (08:00 – 18:00). Traffic management will consist of two-way traffic lights with single lane closures. A site compound has not yet been confirmed but is likely to be within one of the laybys within the scheme extents. Changes in the programme may result in a change to the proposed working hours/commencement dates.

Location

The scheme is located on a 500m stretch of the A82 at Glen Coe in the Highland Council Local Authority area. Refer to Table 2 and Figures 1 & 2 below for individual rock slope locations.

Table 2 – National Grid References (NGRs) for rock slope locations

Slope

National Grid References

Start

End

Slope 1

NN 18205 56286

NN 18325 56251

Slope 2

NN 18200 56276

NN 18234 56252

Slope 3

NN 18390 56273

NN 18464 56340

Slope 4

NN 18509 56378

NN 18562 56404

Slope 5

NN 18624 56383

NN 18694 56320

Slope 6

NN 18636 56389

NN 18565 56415