Description of local environment
Air quality
There are no Air Quality Management Areas (AQMAs) or Air Quality Monitoring Stations (AQMS) within 10km of the scheme extent.
There are no registered sites on the Scottish Pollutant Release Inventory (SPRI) located within 10km of the scheme.
Baseline air quality is likely to be good, with the main sources of air pollution derived from vehicular traffic on the A82 trunk road, local roads and urban activities associated with Spean Bridge. Secondary sources are likely derived from surrounding pastoral land which is used by sheep and cattle.
Cultural heritage
There are no World Heritage Sites, Scheduled Monuments, Battlefields, Conservation Areas or Garden and Designed Landscapes located within 300m of the scheme (PastMap).
At its southern extent, the scheme includes the footway on the Category B Listed Building ‘Spean Bridge Over River Spean’ (LB6840) (PastMap).
Category A Listed Building ‘Spean Bridge, Commando Memorial’ (LB6842) lies 120m northwest of the scheme (PastMap).
Of lesser Cultural Heritage significance, several Historic Environment Records (HERs) and National Records of the Historic Environment (NRHE) lie within 300m of the scheme (PastMap). The nearest of these is noted as both HER and NRHE, lies within the scheme extents, and relates to the Listed Building, ‘Spean Bridge Over River Spean’.
Landscape and visual effects
The scheme is not located within a National Park or National Scenic Area (NSA) (NatureScot).
The Landscape Character Type (LCT) at the scheme extent is ‘LCT 235 - Broad Forested Strath’, which has the following special qualities:
- Broad, low-lying straths with rolling relief and sculptural glacial landforms.
- Simple, large scale mosaic of forested ridges, rolling pastures and heather moorland, but dominated by swathes of forestry.
- A comparatively densely settled landscape with villages, houses and sporadic commercial development.
- Quarries hidden amongst the woodland cover.
- Strong communication and service corridors.
- Long distance views from surrounding hills over the glens, which are framed by steep glen sides.
- Lochs, rivers or canals on glen floor have often been engineered or substantially altered by man.
The scheme lies partly within the village of Spean Bridge. Land surrounding the scheme’s southern extents is dominated by urban development consisting of residential and commercial properties, whereas land surrounding the mid-section and the northern section is dominated by woodland and fields of pastoral land.
Land use immediately surrounding the scheme extent is classified as (HLA Map):
- Rough grazing
- Recreation area
- Managed woodland
- Urban area
- Freshwater areas
- Cemetery
The A82 trunk road, within the northwest Network Management Contract (NMC), connects Alexandria with Crianlarich, Fort William and Inverness. It commences immediately north of the Tullichewan Roundabout in Alexandria, leading generally northwards for a distance of 243 kilometres, to its junction with the A9 at (but excluding) the Longman Roundabout in Inverness. The A82 is predominantly single carriageway along its length, with some stretches of ‘2+1’ carriageway. The A82 is a single carriageway at the scheme extent.
Biodiversity
The scheme is not located within 2km of, nor does it have ecological connectivity with, any European sites (e.g. Special Areas of Conservation (SACs), Special Protection Areas (SPAs), Ramsar sites) (SiteLink).
There are no other locally or nationally designated sites for biodiversity features (e.g. Sites of Special Scientific Interest (SSSI), Local or National Nature Reserves) within 300m of the scheme (SiteLink).
The National Biodiversity Network (NBN) Atlas holds records of numerous bird species within 2km of the scheme. The search criteria included only records during the past ten years, and which have open-use attributions (OGL, CC0, CC-BY). Under the Wildlife and Countryside Act 1981 (as amended), all wild birds and their active nests are protected, with certain species receiving additional protections.
The NBN Atlas holds no records of invasive non-native species (INNS) of plant, injurious weeds or invasive native perennials (as listed in the NMC) under the same search criteria; however, this does not preclude their potential presence in the area.
A search using Transport Scotland’s Asset Management Performance System (AMPS) found no records of INNS, injurious weeds or invasive native perennials (as listed in the NMC) along the verges of the A82 within the scheme extent.
Habitat close to the scheme is predominantly comprised of grazing pastures, freshwater habitat and woodland, with residential and commercial properties present at the scheme’s southern extents.
One area of trees listed on the Ancient Woodland Inventory (AWI) as ‘ancient (of semi-natural origin)’ lies adjacent to the A82 northbound carriageway within the scheme extents. In addition, an area of trees listed as ‘long-established (of plantation origin)’ lies 30m northeast of the scheme.
There is one area of trees covered by a Tree Preservation Order (TPO) by the Highland Council within 300m of the scheme. ‘Spean Lodge’ (HRC36) is an area of trees covered by TPO and lies 30m southwest of the scheme.
The BEAR Scotland Northwest (NW) Environment Team undertook an ecological constraints survey (ECS), including a ground-level tree assessment (GLTA), within the scheme extents and associated disturbance buffers to inform the environmental assessment of the proposed works.
Geology and soils
Parallel Roads of Lochaber SSSI (NatureScot Site Code: 1272) overlaps the scheme extent and is designated for the following geological features:
- Fluvial Geomorphology of Scotland
- Quaternary of Scotland
Parallel Roads of Lochaber SSSI is fully overlapped by Glen Roy and the Parallel Roads of Lochaber Geological Conservation Review Site (GCRS) (NatureScot).
Component soils at the scheme extent are humus iron podzols and humus iron podzols with peaty gleys. Soils surrounding the scheme extent are of Carbon and Peatland Map 2016 Class 0; mineral soils where peat and peatland habitats are not typically found (Scotland’s Soils).
Bedrock geology at the scheme extent consists of ‘Glen Fintaig Semipelite Formation - semipelite’, ‘Fort William Formation - micaceous psammite and semipelite’ and ‘Grampian Group - schistose semipelite’. Superficial deposits are ‘Glaciofluvial sheet deposits - gravel, sand and silt’ and ‘Hummocky (Moundy) Glacial Deposits - diamicton, sand and gravel’ (Scottish Geology Trust).
Material assets and waste
The proposed works will entail the A82 footway upgrade works, with materials used to consist of:
- 50mm dense AC binder course
- 20mm dense surface course
- Pre-cast concrete kerbs
- Tactile slabs
- ST1 concrete
- Steel ire gabion baskets
- Aggregate for basket infill
Wastes are anticipated to be primarily planings from the footway surface course, existing pre-cast kerbs, one tree to be removed, and excavated soil for installation of gabion baskets.
Road planings and kerbs will be recycled or disposed of in a licenced waste facility. The tree to be removed will be recycled and/or left in habitat piles along the trunk road within the scheme extents and excavated soil will be side casted within the scheme.
The value of the scheme does not exceed £350,000; therefore, a Site Waste Management Plan (SWMP) is not required.
Noise and vibration
For residential, community and commercial receptors refer to the ‘Population and Human Health’ section below.
The works do not fall within a Candidate Noise Management Area (CNMA) as defined by Transport Scotland’s Transport Noise Action Plan (TNAP) 2024-2028.
The average day, evening and night (LDEN) noise level at the scheme extent is between 60-70dB (Scotland’s Noise Map).
Baseline noise levels are likely low, with the primary sources from vehicular traffic on the A82 trunk road, local road network and urban activities associated with Spean Bridge. Secondary sources are likely derived from nearby land management activities.
Population and human health
The southern extent of the scheme is located within the village of Spean Bridge, with numerous residential, commercial and community properties situated within 300m of the scheme. The closest properties are located approximately 3 - 5m from the road and face directly onto the A82. These properties have limited or no visual screening, with existing screening generally comprising low, approximately 1m high, wood-slat fencing.
Numerous junctions and access points are located within the scheme extents, including the A82 junction with the A86 at the southern extent of the scheme.
A paved pedestrian footway runs adjacent to the full extent of the A82 NB carriageway within the scheme extents. A further section of paved footway is located adjacent to the SB A82 carriageway at the southern extent of the scheme.
One layby lies along the A82 NB carriageway within the scheme extents.
The walking route ‘Commando Memorial & High Bridge, Spean Bridge’ listed on WalkHighlands and the Core Path ‘Spean Bridge to Commando Memorial on A82 Pavement’ utilise the A82 NB footway within the scheme extent (Highland Council). The Commando Memorial which lies 120m northwest of the scheme is a popular tourist destination in the local area.
There are no National Cycle Routes within 300m of the scheme extents.
Transport Scotland’s manual data counter (Site ID: 0000ATC01036) located 3.4km north of the scheme, recorded an annual daily total (ADT) of 4,697 motor vehicles in 2025, of which 20.8% were heavy goods vehicles (HGVs).
Road drainage and the water environment
The scheme extent is located over two groundwater areas: ‘Spean and Lochy Sand and Gravel’ (ID: 150776) and ‘Fort William’ (ID: 150696). In 2024, both were assigned ‘Good Ecological Potential’ by the Scottish Environment Protection Agency (SEPA) under the Water Framework Directive 2000/60/EC (WFD) (SEPA).
The River Spean (Lochy to Laggan Dam) (ID: 20346) is a river in the River Lochy catchment of the Scotland river basin district and is spanned by the A82 within the scheme extents. In 2024, the River Spean (Lochy to Laggan Dam) was assigned ‘Good Ecological Potential’ by SEPA under the WFD (SEPA).
There are several minor and unclassified waterbodies and drains within 300m of the scheme and culverted under the A82 trunk road (SEPA).
SEPA Flood Map has indicated that there is a medium to high chance of surface water and small watercourse flooding (i.e. a 0.5-10% chance of flooding each year) throughout the scheme extent.
Climate
The Climate Change (Scotland) Act 2009 (‘The Act’), and its subsequent amendment under the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019, sets the framework for the Scottish Government to address climate change. The Act has an ambitious target to reach Net Zero greenhouse gas emissions by 2045, with any residual emissions balanced by removing carbon dioxide from the atmosphere. This is five years earlier than the rest of the UK due to the greater potential for carbon sequestration in Scotland.
The Act was amended to replace interim targets with carbon budgets. Carbon budgets are legally binding caps on greenhouse gas emissions in Scotland over five-year periods. In line with the Act, the Climate Change Committee (CCC) published advice on the level of Scotland’s four carbon budgets, covering the period 2026 to 2045, recommending what the Scottish Government sets its carbon budgets at for annual average levels of emissions. These recommendations are based on an ambitious but credible route to Net Zero for Scotland by 2045.
Emissions reductions from surface transport are the largest contribution to meeting the first two carbon budgets. The pathway for surface transport emission reduction is primarily driven by the uptake of electric vehicles, in addition to measures to enable a shift from car use to public transport and active travel, which all play a role in reducing emissions from fossil fuel cars. Ensuring efficiency of existing transport infrastructure and improving/providing new active travel facilities is therefore important to support these carbon reduction budgets.
Transport is the largest contributor to harmful climate emissions in Scotland. In response to the climate emergency, Transport Scotland are committed to reducing their emissions by 75% by 2030 and to the above noted legally binding target of net-zero by 2045. Transport Scotland is committed to reducing carbon across Scotland’s transport network and this commitment is being enacted through the Mission Zero for Transport (Mission Zero for transport | Transport Scotland).