Statement of case in support of a Determination that a statutory EIA is not required

This is a relevant project in terms of section 55A(16) of the Roads (Scotland) Act 1984 as it is a project for the improvement of a road and the completed works (together with any area occupied by apparatus, equipment, machinery, materials, plant, spoil heaps, or other such facilities or stores required during the period of construction) is situated wholly within Parallel Roads of Lochaber SSSI, which is a sensitive area within the meaning of regulation 2(1) of the Environmental Impact Assessment (Scotland) Regulations 1999.

The project has been subject to screening using the Annex III criteria to determine whether a formal Environmental Impact Assessment is required under the Roads (Scotland) Act 1984 (as amended by The Roads (Scotland) Act 1984 (Environmental Impact Assessment) Regulations 2017). Screening using Annex III criteria, reference to consultations undertaken and review of available information has not identified the need for a statutory EIA.

The project will not have significant effects on the environment by virtue of factors such as:

Characteristics of the scheme:

  • Works are restricted to like-for-like replacement of worn A82 NB footway surface, replacement of kerbs and gullies, removal of one tree, and installation of gabion baskets along a 25m stretch of the A82 NB footway.
  • Construction activities are restricted to area of 0.125ha (along a 1,732m stretch of the A82).
  • The works will be temporary, transient, localised, and completed during primary daytime working (09:00 – 16:00) with some nighttime working (20:00 – 06:00) within the village of Spean Bridge.
  • Works are not expected to result in significant disturbance to protected species that may be present in the wider area.
  • The risk of major accidents or disasters is considered to be low.
  • Removing the footway defects will improve the safety of users of the A82 NB footway.
  • No impacts to the environment are expected during the operational phase as a result of works. The works are expected to result in positive impacts on road users during the operational phase.

Location of the scheme:

  • The scheme is located within the existing A82 road boundary (footway) with potential to enter nearby agricultural land for installation of gabion baskets. Access will be agreed with the landowner prior to the works.
  • There are no European sites which hold an ecological connectivity with the scheme extents.
  • The scheme at its southern extent lies on the A82 bridge over the River Spean, which is a Category B Listed Building. If required, LBC will be obtained prior to works commencing within the curtilage of the Listed Building.
  • The scheme lies within Parallel Roads of Lochaber SSSI. SSSI Consent will be obtained from NatureScot if identified to be required. The SSSI is overlapped by Parallel Roads of Lochaber Geological Conservation Review Site (GCRS).
  • The scheme lies within an NMU route, which is also noted as Walking route ‘Commando Memorial & High Bridge, Spean Bridge’ and Core Path ‘Spean Bridge to Commando Memorial on A82 Pavement’. Access for NMUs will be maintained.

Characteristics of potential impacts of the scheme:

  • Any potential disturbance impacts of the works are expected to be temporary, short-term, non-significant, and limited to the construction phase.
  • Measures will be in place to ensure appropriate removal and disposal of waste.
  • No impacts on the environment are expected during the operational phase as a result of works. The works are expected to result in positive impacts on road users, ecological and human receptors during the operational phase.
  • Works are programmed to be of short duration, transient undertaken on a rolling programme. The nosiest night-time operation will be completed by 23:00.
  • As the works will be limited to the maintenance of the trunk road footway; there is no change to the vulnerability of the road to the risk or severity of major accidents/disasters that would impact on the environment.
  • Mitigation measures detailed above (and in the SEMP) will be put in place with the objective to prevent and, if required, subsequently control any potential impacts on sensitive receptors.
  • Any short-term impacts on pedestrians and NMUs are considered negligible.