Statement of case in support of a Determination that a statutory EIA is not required

This is a relevant project in terms of section 55A(16) of the Roads (Scotland) Act 1984 as it is a project for the improvement of a road and the completed works (together with any area occupied by apparatus, equipment, machinery, materials, plant, spoil heaps, or other such facilities or stores required during the period of construction) are situated in whole or in part in the Loch Lomond and the Trossachs National Park which is a sensitive area within the meaning of regulation 2(1) of the Environmental Impact Assessment (Scotland) Regulations 1999.

The project has been subject to screening using the Annex III criteria to determine whether a formal Environmental Impact Assessment is required under the Roads (Scotland) Act 1984 (as amended by The Roads (Scotland) Act 1984 (Environmental Impact Assessment) Regulations 2017). Screening using Annex III criteria, reference to consultations undertaken and review of available information has not identified the need for a statutory EIA.

The project will not have significant effects on the environment by virtue of factors such as:

Characteristics of the scheme:

  • Works are restricted to the excavation and reinforcement of verges, and cutting of grips for drainage, with all works restricted to made ground on the A82 trunk road.
  • Construction activities are restricted to an area of 0.19ha, along a 630m stretch of the A82.
  • The works will be temporary, transient, localised, and completed during daytime hours on a rolling programme.
  • Works are not expected to result in significant disturbance to protected species that may be present in the wider area.
  • The risk of major accidents or disasters is considered to be low.
  • The edge of the road has severely deteriorated due to stagnant water and inadequate drainage. Addressing these issues will result in safer conditions for road users.
  • No impacts on the environment are expected during the operational phase as a result of works. The works are expected to result in positive impacts on road users during the operational phase.
  • As the works will be limited to the like-for-like replacement of the structural components, there is no change to the vulnerability of the road to the risk or severity of major accidents/disasters that would impact on the environment.

Location of the scheme:

  • The scheme extent is located within LLTNP. Consultation with LLTNP will be carried out prior to works with any recommendations from the National Park Authority to be implemented into the works design. Furthermore, works will not commence until the LLTNP authority have authorised the works.
  • The scheme is located within the existing A82 trunk road boundary and as such, no land take will be required.
  • The scheme is located approximately 55m west of the River Tay SAC. The assessment concluded that there would be no AESI on the qualifying features.
  • Any impacts to the local landscape during the construction phase will be minor, temporary and not considered significant. In addition, no operational impacts are anticipated.

Characteristics of potential impacts of the scheme:

  • Any potential impacts of the works are expected to be temporary, short-term, non-significant, and limited to the construction phase.
  • Measures will be in place to ensure appropriate removal and disposal of waste.
  • Any excavated soil will be reused on site.
  • No impacts on the environment are expected during the operational phase as a result of works. The works are expected to result in positive impacts on road users, ecological and human receptors during the operational phase.
  • As the works will be limited to the A82 verge improvement works, there is no change to the vulnerability of the road to the risk or severity of major accidents/disasters that would impact on the environment.
  • Works are programmed to be of short duration and daytime works will be completed on a rolling programme.

Mitigation measures detailed above (and in the SEMP) will be put in place with the objective to prevent and, if required, subsequently control any potential impacts on sensitive receptors.