Vulnerability of the project to risks

Works are restricted to areas of engineered ground of the A830 trunk road and traffic management will be designed in line with existing guidance. TM will consist of two-way TTL with 10mph convoy, during daytime hours 07:00am to 19:00pm.

A Traffic Management Plan (TMP), which includes measures to avoid or reduce disruption to road traffic, will be produced in accordance with the Traffic Signs Manual (Department of Transport 2009). The TMP will ensure that there is no severance of community assets, access routes or residential development.

These measures along with mitigation measures and standard working practices will be detailed in the SEMP and adhered to on site. The vulnerability of the project to risks of major accidents and disasters is considered to be low.