Assessment of cumulative effects

As detailed in the Description of Main Environmental Impacts and Proposed Mitigation section within this Record of Determination, there are no significant effects anticipated on any environmental receptors as a result of the proposed works.

An HRA was completed and concluded that no likely significant effects (LSE) would occur on the qualifying features of the River Teith SAC due to the lack of in-water works and standard pollution prevention measures which will be employed. As such, no further assessment or consultation with NatureScot was required.