Assessment of cumulative effects
The proposed works are not anticipated to result in significant environmental effects. Due to the nature of the proposed works, no cumulative effects are anticipated with any other developments in the vicinity.
A search of the LLTNP Planning Portal identified one approved planning application within 300m of the scheme. A plan to extend Drummond Fish Farm, located approximately 30m south of the scheme, was approved in April 2026. However, as the proposed works are to be conducted at night, will be of short duration and will move progressively along the scheme extent; any potential construction associated with this development is unlikely to be impacted.
A search of the Scottish Roads Works Commissioner website (Map Search) has identified that there are no roadworks planned for the same period as the proposed works.
BEAR Scotland programme all of their proposed works in line with appropriate guidance and contractual requirements. All schemes are programmed to take into account existing and future planned works, with a view of limiting any cumulative effects relating to TM. As a result of this exercise, where a potential for cumulative impacts is identified, BEAR will reprogramme schemes to avoid / limit any cumulative effects or will utilise existing TM to complete multiple schemes at once. This approach allows BEAR Scotland to effectively manage the potential cumulative effects as a result of TM, resulting in minimal disruption to users of the Scottish trunk road network.
Overall, it is unlikely that the proposed works will have significant cumulative effects with any other future works in the area.