Description of main environmental impacts and proposed mitigation

Air quality

Construction activities associated with the proposed works have the potential to temporarily cause local air quality impacts. Activities undertaken on site may cause dust and particulate matter to be emitted to the atmosphere. However, taking into account the nature and scale of the works and the following mitigation measures, the risk of significant impacts to the air are considered to be low.

  • A water-assisted dust sweeper will sweep the carriageway after dust-generating activities, and waste will be contained and removed from site as soon as is practicable.
  • Materials that have a potential to produce dust will be removed from site as soon as possible, and vehicles that remove waste from site will have sheeted covers.
  • Ancillary plant, vehicles, and non-road mobile machinery (NRMM) will have been regularly maintained, paying attention to the integrity of exhaust systems.
  • Ancillary plant, vehicles and NRMM will be switched off when stationary to prevent exhaust emissions (e.g., there will be no idling vehicles).
  • Cutting, grinding, and sawing equipment (if required) will be fitted or used in conjunction with suitable dust suppression techniques e.g., local exhaust ventilation system that fits directly onto tools.
  • Regular monitoring (e.g., engineer or Clerk of Works) will take place when activities generating air pollution are occurring. In the unlikely event that unacceptable levels of air pollution are emanating from the site, the operation will, where practicable, be modified and re-checked to verify that the corrective action has been effective. Actions to be considered include: (a) minimising cutting and grinding on-site, (b) reducing operating hours, (c) changing the method of working, etc.
  • All delivery vehicles carrying material with dust potential will be covered when travelling to or leaving the site, preventing the spread of dust beyond the work area.
  • Material stockpiles will be reduced as far as is reasonably practicable by using a ‘just in time’ delivery system. All material will also be stored on made ground.
  • Any stockpiled material on site will be monitored daily to ensure no risks of dust emissions exists.
  • Good housekeeping will be employed throughout the work.

With the above mitigation measures in place, it is anticipated that any air quality effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this Record of Determination (RoD).

Landscape and visual effects

The works lie within the boundary of the CNP. However, the works are like-for-like general maintenance of the trunk road surface and as such the works will not have an impact of the landscape character associated with the CNP. The National Park Authority will be notified of the works prior to the construction commencing.

There will be a short-term impact on the landscape character and visual amenity of the site as a result of the presence of construction plant, vehicles, and TM. However, the works are of a short duration (2 nights and 9 nights respectively), undertaken during night-time hours (19:00 – 06:00) and restricted to the A86 carriageway boundary and generally screened from a wider landscape by roadside tree shelterbelts.

Land use will not change as a result of the works, and the works will not result in any residual change to the visual amenity of the local landscape.

In addition, the following mitigation measures will be put in place during works:

  • Throughout all stages of the works, the site will be kept clean and tidy, with materials, equipment, plant and wastes appropriately stored, minimising the landscape and visual effects as much as possible.
  • CNP advice, if received, will be complied with.
  • Works will avoid encroaching on land and areas where work is not required or not permitted. This includes general works, storage of equipment/containers and parking.
  • Where applicable, upon completion of the works, any damage to the local landscape shall be reinstated as much as is practicable.
  • The site will be left clean and tidy following construction.

With the above mitigation measures in place, it is anticipated that any landscape and visual effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Biodiversity

All works will be restricted to the A86 carriageway surface and will not entail any in-stream works or vegetation clearance. There are no significant earthworks associated with the scheme, and the scheme does not require permanent (or temporary) land-take, accommodation works, site clearance or locally gained resources, and there is no requirement to import topsoil. As such, there is limited potential to spread or introduce invasive non-native species (INNS), invasive native perennials, or injurious flowering plant species.

Activities undertaken on site could potentially have a temporary adverse impact on biodiversity in the area as a result of an increased vehicle presence and the potential for disturbance to protected species and pollution of habitats. However, works are restricted to the A86 carriageway and the number of construction vehicles and construction operatives required onsite is low given the scale and scope of the works. In addition, any species in the area are likely to be accustomed to noise and visual disturbance pertaining to vehicle movements on the A86 and the scheme is of short duration (eleven nights) and will be undertaken on a rolling programme. The potential for significant species disturbance within the area of construction is therefore considered to be low.

Although a section of the A86 Inverpattack Lodge scheme is flanked by areas of ancient woodland, no tree felling is planned for the works.

Pollution controls and good practice measures to reduce impacts of works on the local environment will be detailed in the Site Environment Management Plan (SEMP) and adhered to on site. Therefore, with the following mitigation measures in place, the risk of significant impacts on biodiversity are considered to be low:

  • No in-water works will be permitted. Works will be strictly limited to areas required for access and to carry out the works. Unnecessary encroachment onto terrestrial or aquatic areas will not be tolerated.
  • All construction operatives will be briefed through toolbox talks prior to works commencing, which will be included in the SEMP. The toolbox talks will provide information on the legislation, general ecology, and best practice measures for relevant protected species.
  • Site personnel will remain vigilant for the presence of any protected species, throughout the works period. Should a protected species be noted during construction, works will temporarily halt until the species has sufficiently moved on. Any sightings of protected species will be reported to the BEAR Scotland Environmental Team.
  • Artificial lighting (where required) will be directed away from areas of woodland and waterbodies as far as is safe and reasonably practicable.
  • If an active bird nest (e.g., eggs or young present, adult sitting on nest) is identified on site, all works within 30m of the nest will stop until the BEAR Scotland NW Environment Team can provide advice.
  • A ‘soft-start’ will be implemented on site each day. This will involve switching on vehicles and checking under/around vehicles and the immediate work area for mammals prior to works commencing to ensure none are present and that there is a gradual increase in noise.
  • Any excavations, exposed pipes/drains, or areas where an animal could become trapped (e.g. storage containers) will be covered over when not in use, at the end of each shift, and following completion of the works to avoid animals falling in and becoming trapped.
  • If fencing is utilised at any point during the works, a gap of 200mm from ground level will be provided, allowing free passage for mammals and preventing entrapment.

With the above mitigation measures in place, it is anticipated that any biodiversity effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Geology and soils

The scheme is not located within a GCRS or geological SSSI. Although the works will entail minor excavation, this will be on engineered ground. In addition, any excavations will be carried out with good practice measures detailed in the SEMP as follows:

  • Excavated material will be reused and/or redistributed within the scheme extents.
  • Upon completion of the works, any damage to the local landscape will be reinstated as much as is practicable.
  • Mitigation measures to prevent contamination of soils through loss of containment will be strictly adhered to.
  • The parking of machinery/vehicles and storage of equipment on grass will be minimised as far as is reasonably practicable.
  • Additional pollution prevention measures as outlined in the ‘Road drainage and the water environment’ section will be adhered to during construction.

With the above mitigation measures in place, it is anticipated that any geology and soil effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Material assets and waste

There is potential for impacts as a result of resource depletion through use and transportation of new materials. However, materials will be sourced locally where possible and the following mitigation measures will be put in place:

  • Materials will be sourced from recycled origins as far as reasonably practicable within design specifications.
  • Care will be taken to order the correct quantity of required materials to prevent the disposal of unused materials.
  • Where possible, minimal packaging will be requested on required deliveries to reduce unnecessary waste and production of packaging materials.

There is potential for impacts during works as a result of the improper storage or disposal of waste. The following mitigation measures will be put in place:

  • The waste hierarchy (Reduce, Reuse, Recycle and Dispose) will be employed throughout the construction works.
  • The subcontractor will adhere to waste management legislation and ensure they comply with their Duty of Care.
  • Containment measures will be in place to prevent debris or pollutants from entering the surrounding environment.
  • Road planings will be re-used or recycled under a SEPA Paragraph 13(a) waste exemption and in line with BEAR Scotland’s Procedure 126: The Production of Fully Recovered Asphalt Road Planings.
  • All wastes and unused materials will be removed from site in a safe and legal manner by a licensed waste carrier upon completion of the works. The appointed waste carrier must have a valid SEPA waste carrier registration, a copy of which will be provided to and retained by BEAR Scotland as early as possible.
  • All appropriate waste documentation will be present on site and be available for inspection. A copy of the Duty of Care paperwork will be produced and filed appropriately in accordance with the Code of Practice (as made under Section 34 of Environmental Protection Act 1990 as amended).
  • If required, coal tar will be processed as follows:
    • Any coal tar contaminated road planings will be classified as Special Waste.
    • Special waste consignment notes (SWCN) will be obtained from SEPA to allow the movement of the contaminated planings.
    • Coal tar contaminated road planings will be transported by a registered waste carrier to an appropriate waste recovery facility.
    • SEPA will be notified at least 72 hours before (and no longer than one month before) Special Waste leaving site.
  • Re-use and recycling of waste will be encouraged, and the subcontractor will be required to fully outline their plans and provide documentary evidence for waste arising from the works (e.g., waste carrier’s licence, transfer notes, and waste exemption certificates).
  • Staff will be informed that littering will not be tolerated. Staff will be encouraged to collect any litter seen on site.
  • Where applicable, all temporary signage will be removed from site on completion of the works.

With the above mitigation measures in place, it is anticipated that any material assets and waste effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Noise and vibration

Construction activities associated with the proposed scheme have the potential to cause noise and vibration impacts through the use of equipment and construction vehicles for the proposed activities. However, the works are not located within a CNMA or CQA and the proximity of road space suggests that residents within the local area will have a degree of tolerance to noise and disturbance. Works will be completed over eleven nights total on a rolling programme, with the aim being to complete the noisiest works (e.g. planing) by 23:00. Works with the potential to induce worst-case scenario noise and vibration will also be intermittent, temporary, transient and short-lived. Due to the short duration and localised nature of the works, the proposed schemes are anticipated to result in temporary minor noise impacts during the construction programme.

The road surface is in a poor condition, with a series of defects. Replacing the life-expired surface course with TS2010 road surfacing affords the benefits of a reduction in mid-to-high frequency traffic noise and a reduction in ground vibrations. As a result, upon completion of the work, noise associated with the movement of vehicles on the trunk road should decrease post construction.

The following mitigation measures will be put in place:

  • Local residents which are affected by the works will be notified in advance of the works, likely by a letter drop, which will contain details of the proposed timings and duration of the works, in addition to contact details for the Site Supervisor.
  • The Environmental Health Officer (EHO) from Highland Council will be notified of the works.
  • The Best Practicable Means, as defined in Section 72 of the Control of Pollution Act 1874, will be employed at all times to reduce noise to a minimum. On-site construction tasks will be programmed to be as efficient as possible, with a view to limiting noise disruption to local sensitive receptors.
  • All site staff will receive the ‘Being a Good Neighbour’ toolbox talk.
  • Where possible and where works will take place within 300m of residential properties and other sensitive receptors, the noisiest work operations (e.g., cold milling, using breakers (jackhammers), chipping hammers, use of rollers, etc.) will be completed before 23:00.
  • All site personnel will be fully briefed in advance of works regarding the need to minimise noise during works and of the site-specific sensitivities.
  • Drop heights from vehicles and NRMM will be kept to a minimum to minimise noise when unloading.
  • All plant, machinery and vehicles will be switched off when not in use.
  • All plant will be operated in such a way that minimises noise emissions and will have been maintained regularly to the appropriate standards.
  • Where fitted, and where permitted under Health and Safety requirements, white noise reversing alarms will be utilised during construction.
  • Where ancillary plant such as generators are required, they will be positioned so as to cause minimum noise disturbance. Where deemed necessary, acoustic screens will be utilised.

With the above mitigation measures in place, it is anticipated that any noise and vibration effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Population and human health

During construction, activities undertaken on site have the potential to have temporary adverse impacts on local residents, vehicle travellers, and NMUs. Although the A86 will be closed during the works with hourly amnesties in place, the road closure will take place at night when traffic count is at its lowest and no significant congestion issues are noted during the proposed construction hours. In the event of local access restrictions to residential properties, access will be granted as requested. Access to NMU facilities which lie within 300m of the scheme, will be maintained and the works are being undertaken at night when footfall and cyclist count is at its lowest.

Several residential properties are found within 300m of the scheme. The nearest residential property lies just 10m north from the scheme with no screening present and given that the works are being undertaken at night, there is potential for disturbance from noise, vibration and the additional construction lighting.

With the following mitigation measures in place, the risk of significant impacts on population and human health is considered to be low:

  • The works schedule and any changes to this will be communicated to local residents prior to and throughout the programme.
  • Construction lighting will consider the need to avoid illuminating surrounding environment and properties to avoid a nuisance at night, and non-essential lighting will be switched off at night.
  • Appropriate provisions / measures shall be implemented within the traffic management to allow the safe passage of NMUs of all abilities through the site.
  • Journey planning information will be available for drivers online at the trafficscotland.org website. Journey planning information will also be available for drivers online through BEAR’s social media platforms.

With the above mitigation measures in place, it is anticipated that any population and human health effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Road drainage and the water environment

There is potential for temporary impacts on the water environment due to operation of plant within and within proximity to watercourses and/or drainage systems, which may lead to potential changes in water quality from pollution events (either by accidental spillage of sediments, particulate matter, chemicals, fuels or by mobilisation of these in surface water caused by rain).

No in-water works will take place and there is no requirement for the abstraction or transfers of water from, or discharges to, a waterbody. As such, the potential for a direct pollution incident within a waterbody is unlikely. Experience gained from BEAR maintenance schemes elsewhere on the network has shown that where standard good working practice is adopted (e.g., adherence to SEPA good practice guidance, utilisation of drain covers or similar, etc.), water quality is protected.

The works may result in potential direct or indirect effects on surrounding waterbodies. The following mitigation measures will be put in place to reduce the risk of pollution incidents as a result of works:

  • No work has been identified that would require entering any surface waterbodies. If such a need were identified onsite, BEAR Scotland’s Environmental Team will be contacted (before the works commence) to allow consideration of potential environmental effects.
  • Standard working practices to comply with The Water Environment (Controlled Activities) (Scotland) Regulations 2011 (as amended) for works in or near water will be detailed in the SEMP and adhered to on site.
  • No discharges into any watercourses or drainage systems will be permitted. Appropriate containment measures will be in place to prevent any loss of construction materials into the water environment.
  • Appropriate measures will be implemented during resurfacing operations to limit the potential for wastes (i.e., road planings) and materials (i.e., new asphalt) to enter any gullies present on site. On completion of resurfacing operations, any gullies present on site will be visually checked to ensure they have not become blocked as a result of the scheme.
  • An incident response (contingency) plan will be put in place to reduce the risk from pollution incidents or accidental spillages. All necessary containment equipment, including suitable spill kits (for oil and chemicals) will be available on site, quickly accessible if needed, and staff trained in their use.
  • All spills will be logged and reported. In the event of any spills into the water environment, all works will stop, and the incident will be reported to the project manager and the BEAR Scotland Environmental Team. SEPA will be informed of any such incident as soon as possible using the SEPA Pollution Hotline.
  • All plant and equipment will be regularly inspected for any signs of damage and leaks. A checklist will be present to make sure that the checks have been carried out.
  • Storage of hazardous material, oil and fuel containers will be distanced more than 10m away from any watercourses.
  • If required, a designated refuelling area will be identified. Fuel bowsers will be stored on an impermeable area and be fully bunded. This will be distanced more than 10m from any watercourses.
  • During refuelling of smaller mobile plant, a funnel will be used, and drip trays will be in place. Care will be taken to reduce the chance of spillages. Spill kits will be quickly accessible to capture any spills should they occur. The ground/stone around the site of a spill shall be removed, double bagged and taken off site as special contaminated waste.
  • Generators and static plant may have the potential to leak fuel and/or other hydrocarbons and will have bunding with a capacity of 110%. If these are not bunded then drip trays will also be supplied beneath the equipment with a capacity of 110%.

With the above mitigation measures in place, it is anticipated that any road drainage and the water environment effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Climate

Construction activities associated with the proposed scheme works have the potential to cause local air quality impacts as a result of the emission of greenhouse gases through the use of vehicles and machinery, material use and production and transportation of materials to and from site. The following mitigation measures will be put in place:

  • BEAR Scotland will adhere to their Carbon Management Policy.
  • All mitigation measures detailed within ‘Air Quality’ and ‘Material Assets and Waste’ will be adhered to.
  • Local contractors and suppliers will be used as far as practicable to reduce fuel use and greenhouse gas emitted as part of the works.
  • Where possible, materials will be sourced locally to reduce greenhouse gas emissions associated with materials movement, and waste will be removed to a local facility, where required.

With the above mitigation measures in place, it is anticipated that any climate effects associated with the proposed works are unlikely to be significant. This receptor is not considered further in this RoD.

Vulnerability of the project to risks

Small areas within the scheme extents are recorded as being at a high likelihood (10% chance) of river and surface water flooding each year. Works will be programmed as far as is reasonably practicable to avoid periods of adverse weather or heavy rainfall. There will be no change to the likelihood of flooding on the A86 within the scheme extents upon completion of the works.

Works are restricted to areas of engineered ground of the A86 trunk road and traffic management will be designed in line with existing guidance. TM will consist of night-time (19:00-06:00) road closure with hourly amnesties. The road closure and hourly amnesties will be publicised in advance. Local residents will be notified of working hours and provided with appropriate contact information. Pedestrians or other NMUs will be accommodated within the traffic management setup.

A Traffic Management Plan (TMP), which includes measures to avoid or reduce disruption to road traffic, will be produced in accordance with the Traffic Signs Manual (Department of Transport 2009). The TMP will ensure that there is no severance of community assets, access routes or residential development.

These measures along with mitigation measures and standard working practices will be detailed in the SEMP and adhered to on site. The vulnerability of the project to risks of major accidents and disasters is considered to be low.

Assessment cumulative effects

The proposed works are not anticipated to result in significant environmental effects. Due to the nature of the proposed works, no cumulative effects are anticipated with any other developments in the vicinity.

A search of the Highland Council Planning Portal (Highland Council Planning Portal) identified no approved planning application within 300m of the schemes.

A search of the Scottish Road Works Commissioner website (Scottish Road Works Online) has not identified any other roadworks that are currently ongoing, or noted as being planned, on the trunk road at the same time as this scheme. Due to the nature of the proposed works, no cumulative effects are anticipated with any other developments in the vicinity.

BEAR Scotland programme all of their proposed works in line with appropriate guidance and contractual requirements. All schemes are programmed to take into account existing and future planned works, with a view of limiting any cumulative effects or will utilise existing TM to complete multiple schemes at once. This approach allows BEAR Scotland to effectively manage the potential cumulative effects as a result of TM, resulting in minimal disruption to users of the Scottish trunk road network.

Overall, it is unlikely that the proposed works will have a significant cumulative effect with any other future works in the area.