Assessments of the environmental effects
As detailed in the Description of Main Environmental Impacts and Proposed Mitigation section within this Record of Determination, there are no significant effects anticipated on any environmental receptors as a result of the proposed works.
An HRA Proforma was conducted due to proximity and ecological connectivity with the River Spey SAC, Insh Marshes SAC, River Spey-Insh Marshes SPA/RAMSAR Site. The assessment concluded that, with appropriate measures in place, no LSE of the works were identified on the qualifying features of any of the designated sites.