Statement of case in support of a Determination that a statutory EIA is not required
This is a relevant project in terms of section 55A(16) of the Roads (Scotland) Act 1984 as it is a project for the improvement of a road and the completed works (together with any area occupied by apparatus, equipment, machinery, materials, plant, spoil heaps, or other such facilities or stores required during the period of construction) do not exceed 1 hectare in area but are situated in whole within Cairngorms National Park and Drumochter Hills SSSI which are sensitive areas within the meaning of regulation 2(1) of the Environmental Impact Assessment (Scotland) Regulations 1999.
The project has been subject to screening using the Annex III criteria to determine whether a formal Environmental Impact Assessment is required under the Roads (Scotland) Act 1984 (as amended by The Roads (Scotland) Act 1984 (Environmental Impact Assessment) Regulations 2017). Screening using Annex III criteria, reference to consultations undertaken and review of available information has not identified the need for a statutory EIA.
The project will not have significant effects on the environment by virtue of factors such as:
Characteristics of the scheme:
- Consultation undertaken with NatureScot confirmed that the works are not likely to damage the protected natural feature(s) of Drumochter Hills SSSI and therefore, consent is not required for the works.
- Works are restricted to like-for-like replacement of worn road surface and drainage works, with all works restricted to the A9 carriageway boundary.
- Construction activities are restricted to a 187m long section along the A9 trunk road, with a working area of 0.252ha.
- The works will be temporary, transient, localised and will be completed over a rolling programme over 6 nights.
- Works are not expected to result in significant disturbance.
- The risk of major accidents or disasters is considered to be low.
- Measures will be in place to ensure appropriate removal and disposal of waste.
- By removing the carriageway defects this will provide the section of the A9 carriageway with another life cycle, and significantly improve the ride quality, which will result in safer conditions for road users.
- No impacts to the environment are expected during the operational phase as a result of the works. The works are expected to result in positive impacts on road users during the operational phase.
- As the works will be limited to the like-for-like replacement of the structural components, there is no change to the vulnerability of the road to the risk or severity of major accidents/disasters that would impact the environment.
Location of the scheme:
- The scheme will be located within the existing A9 road boundary and as such, no land take will be required.
- The scheme is located within the Cairngorms National Park; however, no change to the visual characteristics of the park is expected due to the nature of the works.
- The scheme is located wholly within Drumochter Hills SSSI which overlaps with Allt Dubhaig Consultation undertaken with NatureScot confirmed that consent is not required for the works.
- No LSE have been identified on the qualifying features of Drumochter Hills SAC and Drumochter Hills SPA as a result of the works.
- There are several properties within 300m of the scheme. Mitigation will be in place to reduce the impact of the works on surrounding sensitive receptors.
- There are no Cultural Heritage features of licensable nature located within, or connected to, the scheme. It is considered likely that construction of the A9 trunk road would have removed any archaeological remains that may have previously been present.
Characteristics of potential impacts of the scheme:
- Any impacts of the works are expected to be temporary, short-term, non-significant, and limited to the construction phase.
- Measures will be in place to ensure appropriate removal and disposal of waste.
- Residual impacts are considered to be beneficial for the travelling public which may use this stretch of the carriageway. In addition, improved road surface will reduce the noise levels from travelling public and in turn will reduce disruption.
- Any mitigation measures advised by the Cairngorms National Park Authority and NatureScot will be adhered to on site.
- The SEMP will include plans to address environmental incidents.
- Mitigation measures detailed above and, in the SEMP, will be in place with the objective to prevent and, if required, subsequently control any potential impacts on sensitive receptors.
- In the event that INNS are found on site, measures to prevent potential INNS spread will be implemented.
- No in-combination effects have been identified.