Vulnerability of the project to risks
There is a low likelihood (0.1% chance) of surface water and small watercourse flooding each year. There will be no change to the likelihood of flooding on the A9 within the scheme extents upon completion of the works.
Works are restricted to areas of engineered ground of the A9 trunk road and TM will be designed in line with existing guidance. TM will consist of three-way temporary traffic lights with convoy. Pedestrians or other NMUs will be accommodated within the traffic management setup.
A Traffic Management Plan (TMP), which includes measures to avoid or reduce disruption to road traffic, will be produced in accordance with the Traffic Signs Manual (Department of Transport 2009). The TMP will ensure that there is no severance of community assets, access routes or residential development.
These measures along with mitigation measures and standard working practices will be detailed in the SEMP and adhered to on site. The vulnerability of the project to risks of major accidents and disasters is considered to be low.