Description

BEAR Scotland has been commissioned by Transport Scotland to undertake resurfacing and general maintenance on a layby adjacent to the A9 trunk road, north of Drumochter. The scheme comprises a 300m stretch of a layby adjacent to the southbound (SB) carriageway of the A9 trunk road, covering an area of 0.249ha. The proposed works will involve the resurfacing of the layby and spillway clearing. Layby signs which are in poor condition will also be replaced and repaired. Missing or damaged verge marker posts will be replaced: it is anticipated that a maximum of two admiral bollards will be replaced at the entrance and exit of the layby, and a maximum of five signs will be replaced within the layby itself. All sign/bollard replacements will be like-for-like. In addition, damaged timber fence posts will be replaced at a small section of the boundary fence near the entrance to the layby.

It is anticipated that minor vegetation clearance will be required as part of the proposed works. This is anticipated to be restricted to the three sections of fenced off areas on the layby verge which have become overgrown and require clearing to ensure sufficient water drainage.

The main plant required for the proposed works will include a paver, planer, excavators and rollers. A welfare unit with generator will be required on site and heavy goods vehicles (HGVs) will be required for the transport of materials and wastes.

The resurfacing procedure is as follows:

  • Set up traffic management (TM) and mark out site
  • Mill out old surface course
  • Lay new surface course
  • Roll surface and allow it to set
  • Install road markings and studs
  • Remove TM and open road

Additional works as described above will be conducted simultaneously.

The works are programmed to begin on the 18th of November 2026 for a duration of five nights with working hours between 19.00 and 06.00. Changes in the programme may result in a change to the proposed working hours/commencement date.

No site compound is required; site access and plant storage will be located within TM. The TM strategy will be in line with recommendations and guidance in the Traffic Signs Manual Chapter 8. TM will involve single lane closure on the A9 SB carriageway, with two-way temporary traffic lights and a convoy system in place during working hours (19.00-06.00). The layby will be fully closed throughout works.

Location

The scheme is located on the SB carriageway of the A9 trunk road at Layby 82, just north of Drumochter, in the Highland Council administrative area. The works will be conducted between National Grid References (NGRs) NN 62968 76555 and NN 63061 76288.