3 Description of the Scheme 3.1 Introduction 3.2 Scheme Length and Cross Section Details 3.3 Main Crossing and the Forth Road Bridge 3.4 Road Infrastructure 3.5 Intelligent Transport Systems (ITS) 3.6 Cost Estimate 3.7 Route Refinement History References