Economic, Environmental and Social Impacts of Changes in Maintenance Spend on the Scottish Trunk Road Network

Appendix E Detailed annual and cumulative costs

Table E.1 to Table E.14 show the detailed annual and cumulative costs for each aspect of the analysis and for each Scenario.

Table E.1 Undiscounted annual costs: 2010/11 to 2020/21

Item

Year

2010/11

11/12

12/13

13/14

14/15

15/16

16/17

17/18

18/19

19/20

20/21

Total Agency Costs (£m)

Scenario 1: Base case

141

141

141

141

141

141

141

141

141

141

141

Scenario 2: 20% cut

114

114

114

114

114

114

114

114

114

114

114

Scenario 3: 40% cut

85

85

85

85

85

85

85

85

85

85

85

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

4,294

4,345

4,395

4,446

4,515

4,585

4,654

4,723

4,784

4,844

4,905

Scenario 2: Vehicle operating costs

4,294

4,348

4,403

4,457

4,530

4,603

4,676

4,749

4,813

4,878

4,942

Scenario 3: Vehicle operating costs

4,294

4,351

4,407

4,464

4,539

4,615

4,690

4,766

4,833

4,900

4,967

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

21

21

21

22

22

22

23

23

23

24

24

Scenario 2: Travel time costs

21

22

22

23

24

25

26

27

27

28

29

Scenario 3: Travel time costs

21

22

23

24

25

26

28

29

30

31

33

Skid resistance analysis (£m)

Scenario 1: Accident costs

23

23

23

23

23

23

23

23

23

23

23

Scenario 2: Accidents costs

23

23

23

23

23

23

23

23

23

23

23

Scenario 3: Accident costs

23

23

23

24

24

24

25

25

26

26

27

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

9

9

9

9

9

8

8

7

7

7

7

Scenario 2: Delay costs

9

6

6

6

6

5

6

5

5

5

5

Scenario 3: Delay costs

9

5

5

5

5

4

4

4

4

4

4

Lighting analysis (£m)

Scenario 1: Lighting accident costs

8

8

8

8

8

8

8

8

8

8

8

Scenario 2: Lighting accident costs

8

9

9

9

9

9

9

9

9

9

9

Scenario 3: Lighting accident costs

8

9

9

9

9

9

9

9

9

9

9

CO2 Emissions (£m)

Scenario 1: CO2 costs

320

327

334

341

348

354

361

368

374

380

386

Scenario 2: CO2 costs

320

326

333

340

346

353

359

365

371

377

383

Scenario 3: CO2 costs

319

326

333

339

345

351

358

364

369

375

381

Table E.2 Undiscounted annual costs: 2021/22 to 2030/31

Item

Year

2021/22

22/23

23/24

24/25

25/26

26/27

27/28

28/29

29/30

30/31

Total Agency Costs (£m)

Scenario 1: Base case

141

141

141

141

141

141

141

141

141

141

Scenario 2: 20% cut

119

125

130

136

141

145

149

152

156

160

Scenario 3: 40% cut

97

108

119

130

141

145

149

152

156

160

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

4,960

5,015

5,070

5,125

5,180

5,241

5,302

5,363

5,425

5,486

Scenario 2: Vehicle operating costs

4,998

5,053

5,109

5,164

5,220

5,279

5,338

5,398

5,457

5,516

Scenario 3: Vehicle operating costs

5,023

5,079

5,135

5,191

5,247

5,304

5,362

5,420

5,478

5,535

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

24

25

25

26

26

26

27

27

28

28

Scenario 2: Travel time costs

30

30

31

32

32

33

33

33

34

34

Scenario 3: Travel time costs

33

34

35

36

37

37

37

37

38

38

Skid resistance analysis (£m)

Scenario 1: Accident costs

23

23

23

23

23

23

23

23

23

23

Scenario 2: Accidents costs

23

23

23

23

23

23

23

23

23

23

Scenario 3: Accident costs

26

25

24

24

23

23

23

23

23

23

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

7

7

7

7

7

7

7

7

7

7

Scenario 2: Delay costs

5

6

6

6

6

7

7

7

7

7

Scenario 3: Delay costs

4

5

5

6

6

7

7

7

7

7

Lighting analysis (£m)

Scenario 1: Lighting accident costs

8

8

8

8

8

8

8

8

8

8

Scenario 2: Lighting accident costs

8

8

8

8

8

8

8

8

8

8

Scenario 3: Lighting accident costs

9

9

9

9

9

8

8

8

8

8

CO2 Emissions (£m)

Scenario 1: CO2 costs

392

399

405

411

418

426

435

444

452

459

Scenario 2: CO2 costs

389

395

402

408

414

423

432

440

449

456

Scenario 3: CO2 costs

387

393

400

406

412

421

430

439

447

454

Table E.3 Undiscounted annual costs compared to Base Case: 2010/11 to 2020/21

Item

Year

2010/11

11/12

12/13

13/14

14/15

15/16

16/17

17/18

18/19

19/20

20/21

Total Agency Costs (£m)

Scenario 1: Base case

0

0

0

0

0

0

0

0

0

0

0

Scenario 2: 20% cut

-28

-28

-28

-28

-28

-28

-28

-28

-28

-28

-28

Scenario 3: 40% cut

-56

-56

-56

-56

-56

-56

-56

-56

-56

-56

-56

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

0

51

101

152

221

291

360

429

490

550

611

Scenario 2: Vehicle operating costs

0

54

109

163

236

309

382

455

519

584

648

Scenario 3: Vehicle operating costs

0

57

113

170

245

321

396

472

539

606

673

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

0

0

0

0

1

1

2

2

2

3

3

Scenario 2: Travel time costs

0

1

1

2

3

4

5

6

6

7

8

Scenario 3: Travel time costs

0

1

2

3

4

5

7

8

9

10

12

Skid resistance analysis (£m)

Scenario 1: Accident costs

0

0

0

0

0

0

0

0

0

0

0

Scenario 2: Accidents costs

0

0

0

0

0

0

0

0

0

0

0

Scenario 3: Accident costs

0

0

1

1

1

2

2

3

3

4

4

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

0

0

1

0

0

-1

-0

-1

-1

-1

-2

Scenario 2: Delay costs

0

-2

-2

-2

-2

-3

-3

-3

-4

-4

-4

Scenario 3: Delay costs

0

-4

-4

-4

-4

-5

-4

-5

-5

-5

-5

Lighting analysis (£m)

Scenario 1: Lighting accident costs

0

0

0

0

0

0

0

0

0

0

0

Scenario 2: Lighting accident costs

0

0

0

0

0

0

0

0

0

0

0

Scenario 3: Lighting accident costs

0

0

0

0

0

0

0

0

0

0

0

CO2 Emissions (£m)

Scenario 1: CO2 costs

0

7

14

21

28

34

41

48

54

60

66

Scenario 2: CO2 costs

-0

6

13

20

26

32

39

45

51

57

63

Scenario 3: CO2 costs

-1

6

12

19

25

31

37

44

49

55

61

Table E.4 Undiscounted annual costs compared to Base Case: 2021/22 to 2030/31

Item

Year

2021/22

22/23

23/24

24/25

25/26

26/27

27/28

28/29

29/30

30/31

Total Agency Costs (£m)

Scenario 1: Base case

0

0

0

0

0

0

0

0

0

0

Scenario 2: 20% cut

-22

-17

-11

-6

0

4

7

11

15

19

Scenario 3: 40% cut

-45

-34

-22

-11

0

4

7

11

15

19

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

666

721

776

831

886

947

1,008

1,069

1,131

1,192

Scenario 2: Vehicle operating costs

704

759

815

870

926

985

1,044

1,104

1,163

1,222

Scenario 3: Vehicle operating costs

729

785

841

897

953

1,010

1,068

1,126

1,184

1,241

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

3

4

4

4

5

5

6

6

7

7

Scenario 2: Travel time costs

9

9

10

11

11

12

12

12

13

13

Scenario 3: Travel time costs

12

13

14

15

15

16

16

16

17

17

Skid resistance analysis (£m)

Scenario 1: Accident costs

0

0

0

0

0

0

0

0

0

0

Scenario 2: Accidents costs

0

0

0

0

0

0

0

0

0

0

Scenario 3: Accident costs

3

3

2

1

0

0

0

0

0

0

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

-1

-1

-1

-1

-2

-2

-2

-1

-1

-1

Scenario 2: Delay costs

-3

-3

-3

-2

-2

-2

-2

-2

-1

-1

Scenario 3: Delay costs

-4

-4

-3

-2

-2

-2

-2

-2

-1

-1

Lighting analysis (£m)

Scenario 1: Lighting accident costs

0

0

0

0

0

0

0

0

0

0

Scenario 2: Lighting accident costs

0

0

0

0

0

0

0

0

0

0

Scenario 3: Lighting accident costs

0

0

0

0

0

0

0

0

0

0

CO2 Emissions (£m)

Scenario 1: CO2 costs

72

79

85

91

98

106

115

123

132

139

Scenario 2: CO2 costs

69

75

82

88

94

103

112

120

129

136

Scenario 3: CO2 costs

67

73

80

86

92

101

110

118

127

134

Table E.5 Cumulative undiscounted costs: 2010/11 to 2020/21

Item

Year

2010/11

11/12

12/13

13/14

14/15

15/16

16/17

17/18

18/19

19/20

20/21

Total Agency Costs (£m)

Scenario 1: Base case

141

283

424

566

707

849

990

1,132

1,273

1,414

1,556

Scenario 2: 20% cut

114

228

341

455

569

683

797

910

1,024

1,138

1,252

Scenario 3: 40% cut

85

171

256

341

427

512

597

683

768

854

939

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

4,294

8,639

13,034

17,480

21,996

26,580

31,234

35,958

40,742

45,586

50,491

Scenario 2: Vehicle operating costs

4,294

8,642

13,045

17,502

22,032

26,635

31,311

36,060

40,873

45,751

50,693

Scenario 3: Vehicle operating costs

4,294

8,645

13,052

17,516

22,056

26,671

31,361

36,127

40,960

45,860

50,827

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

21

42

64

85

107

129

152

175

199

222

246

Scenario 2: Travel time costs

21

43

65

88

112

137

162

189

216

245

274

Scenario 3: Travel time costs

21

43

66

90

115

141

169

198

228

259

292

Skid resistance analysis (£m)

Scenario 1: Accident costs

23

45

68

91

113

136

159

181

204

227

249

Scenario 2: Accidents costs

23

45

68

91

113

136

159

181

204

227

249

Scenario 3: Accident costs

23

46

69

92

116

141

165

191

216

243

270

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

9

17

26

35

44

52

60

68

75

82

89

Scenario 2: Delay costs

9

15

21

27

34

39

45

50

55

60

65

Scenario 3: Delay costs

9

13

18

23

28

32

37

41

44

48

52

Lighting analysis (£m)

Scenario 1: Lighting accident costs

8

17

25

34

42

50

59

67

76

84

93

Scenario 2: Lighting accident costs

8

17

25

34

42

51

59

68

76

85

93

Scenario 3: Lighting accident costs

8

17

26

34

43

51

60

69

77

86

94

CO2 Emissions (£m)

Scenario 1: CO2 costs

320

647

981

1,322

1,670

2,025

2,386

2,753

3,127

3,507

3,893

Scenario 2: CO2 costs

320

646

979

1,319

1,665

2,018

2,377

2,742

3,113

3,490

3,873

Scenario 3: CO2 costs

319

646

978

1,317

1,662

2,014

2,371

2,735

3,104

3,479

3,860

Table E.6 Cumulative undiscounted costs: 2021/22 to 2030/31

Item

Year

2021/22

22/23

23/24

24/25

25/26

26/27

27/28

28/29

29/30

30/31

Total Agency Costs (£m)

Scenario 1: Base case

1,697

1,839

1,980

2,122

2,263

2,405

2,546

2,687

2,829

2,970

Scenario 2: 20% cut

1,371

1,496

1,626

1,762

1,904

2,049

2,197

2,350

2,506

2,666

Scenario 3: 40% cut

1,035

1,143

1,262

1,392

1,534

1,679

1,828

1,980

2,136

2,296

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

55,451

60,466

65,536

70,661

75,842

81,083

86,385

91,749

97,173

102,659

Scenario 2: Vehicle operating costs

55,691

60,744

65,853

71,017

76,237

81,517

86,855

92,253

97,710

103,226

Scenario 3: Vehicle operating costs

55,851

60,930

66,065

71,255

76,502

81,806

87,169

92,588

98,066

103,602

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

271

296

321

346

372

399

425

453

481

509

Scenario 2: Travel time costs

304

334

366

397

430

462

495

528

562

596

Scenario 3: Travel time costs

326

360

395

430

467

504

541

578

616

654

Skid resistance analysis (£m)

Scenario 1: Accident costs

272

295

317

340

363

385

408

431

453

476

Scenario 2: Accidents costs

272

295

317

340

363

385

408

431

453

476

Scenario 3: Accident costs

296

321

345

369

391

414

437

460

482

505

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

97

104

111

119

126

133

140

147

154

162

Scenario 2: Delay costs

71

76

82

89

95

102

108

115

122

130

Scenario 3: Delay costs

56

61

66

73

79

86

92

99

106

114

Lighting analysis (£m)

Scenario 1: Lighting accident costs

101

109

118

126

135

143

151

160

168

177

Scenario 2: Lighting accident costs

102

110

119

127

136

144

153

161

170

178

Scenario 3: Lighting accident costs

103

112

120

129

137

146

154

163

171

179

CO2 Emissions (£m)

Scenario 1: CO2 costs

4,286

4,685

5,090

5,501

5,919

6,345

6,780

7,224

7,676

8,135

Scenario 2: CO2 costs

4,262

4,657

5,059

5,467

5,881

6,304

6,736

7,176

7,625

8,081

Scenario 3: CO2 costs

4,247

4,640

5,040

5,446

5,858

6,279

6,709

7,148

7,595

8,050

Table E.7 Discounted annual costs: 2010/11 to 2020/21

Item

Year

2010/11

11/12

12/13

13/14

14/15

15/16

16/17

17/18

18/19

19/20

20/21

Total Agency Costs (£m)

Scenario 1: Base case

141

137

132

128

123

119

115

111

107

104

100

Scenario 2: 20% cut

114

110

106

103

99

96

93

89

86

84

81

Scenario 3: 40% cut

85

82

80

77

74

72

69

67

65

63

61

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

4,294

4,198

4,103

4,010

3,935

3,860

3,786

3,712

3,633

3,555

3,477

Scenario 2: Vehicle operating costs

4,294

4,201

4,110

4,020

3,948

3,876

3,804

3,733

3,655

3,579

3,504

Scenario 3: Vehicle operating costs

4,294

4,204

4,114

4,026

3,956

3,886

3,816

3,746

3,670

3,595

3,521

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

21

21

20

19

19

19

18

18

18

17

17

Scenario 2: Travel time costs

21

21

21

21

21

21

21

21

21

21

21

Scenario 3: Travel time costs

21

21

21

22

22

22

22

23

23

23

23

Skid resistance analysis (£m)

Scenario 1: Accident costs

23

22

21

20

20

19

18

18

17

17

16

Scenario 2: Accidents costs

23

22

21

20

20

19

18

18

17

17

16

Scenario 3: Accident costs

23

22

22

21

21

20

20

20

20

19

19

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

9

8

9

8

8

6

7

6

5

5

5

Scenario 2: Delay costs

9

6

6

6

5

5

5

4

4

4

3

Scenario 3: Delay costs

9

5

5

4

4

3

4

3

3

3

3

Lighting analysis (£m)

Scenario 1: Lighting accident costs

8

8

8

8

7

7

7

7

6

6

6

Scenario 2: Lighting accident costs

8

8

8

8

7

7

7

7

6

6

6

Scenario 3: Lighting accident costs

8

8

8

8

8

7

7

7

7

6

6

CO2 Emissions (£m)

Scenario 1: CO2 costs

320

316

312

308

303

298

294

289

284

279

274

Scenario 2: CO2 costs

320

315

311

307

302

297

292

287

282

276

271

Scenario 3: CO2 costs

319

315

310

306

301

296

291

286

280

275

270

Table E.8 Discounted annual costs: 2021/22 to 2030/31

Item

Year

2021/22

22/23

23/24

24/25

25/26

26/27

27/28

28/29

29/30

30/31

Total Agency Costs (£m)

Scenario 1: Base case

97

94

90

87

84

82

79

76

74

71

Scenario 2: 20% cut

82

83

83

84

84

84

83

82

81

80

Scenario 3: 40% cut

66

71

76

80

84

84

83

82

81

80

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

3,397

3,319

3,242

3,166

3,092

3,023

2,955

2,887

2,822

2,757

Scenario 2: Vehicle operating costs

3,423

3,344

3,267

3,190

3,116

3,045

2,975

2,906

2,839

2,772

Scenario 3: Vehicle operating costs

3,441

3,361

3,283

3,207

3,132

3,059

2,988

2,918

2,849

2,782

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

17

16

16

16

15

15

15

15

14

14

Scenario 2: Travel time costs

20

20

20

20

19

19

18

18

18

17

Scenario 3: Travel time costs

23

23

22

22

22

21

21

20

20

19

Skid resistance analysis (£m)

Scenario 1: Accident costs

16

15

14

14

14

13

13

12

12

11

Scenario 2: Accidents costs

16

15

14

14

14

13

13

12

12

11

Scenario 3: Accident costs

18

17

16

15

14

13

13

12

12

11

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

5

5

5

5

4

4

4

4

4

4

Scenario 2: Delay costs

4

4

4

4

4

4

4

4

4

4

Scenario 3: Delay costs

3

3

3

4

4

4

4

4

4

4

Lighting analysis (£m)

Scenario 1: Lighting accident costs

6

6

5

5

5

5

5

5

4

4

Scenario 2: Lighting accident costs

6

6

5

5

5

5

5

5

4

4

Scenario 3: Lighting accident costs

6

6

5

5

5

5

5

5

4

4

CO2 Emissions (£m)

Scenario 1: CO2 costs

269

264

259

254

249

246

242

239

235

231

Scenario 2: CO2 costs

266

262

257

252

247

244

241

237

234

229

Scenario 3: CO2 costs

265

260

256

251

246

243

240

236

233

228

Table E.9 Discounted annual costs compared to Base Case: 2010/11 to 2020/21

Item

Year

2010/11

11/12

12/13

13/14

14/15

15/16

16/17

17/18

18/19

19/20

20/21

Total Agency Costs (£m)

Scenario 1: Base case

0

-5

-9

-14

-18

-22

-26

-30

-34

-38

-41

Scenario 2: 20% cut

-28

-31

-35

-39

-42

-46

-49

-52

-55

-58

-61

Scenario 3: 40% cut

-56

-59

-62

-64

-67

-70

-72

-74

-77

-79

-81

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

0

-96

-191

-284

-359

-434

-508

-582

-661

-740

-817

Scenario 2: Vehicle operating costs

0

-93

-184

-274

-346

-419

-490

-561

-639

-715

-790

Scenario 3: Vehicle operating costs

0

-90

-180

-268

-338

-408

-478

-548

-624

-699

-773

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

0

-1

-1

-2

-2

-2

-3

-3

-3

-4

-4

Scenario 2: Travel time costs

0

-0

-0

-0

-0

-0

-0

-0

-0

-0

-0

Scenario 3: Travel time costs

0

0

0

0

1

1

1

2

2

2

2

Skid resistance analysis (£m)

Scenario 1: Accident costs

0

-1

-2

-2

-3

-4

-4

-5

-5

-6

-7

Scenario 2: Accidents costs

0

-1

-2

-2

-3

-4

-4

-5

-5

-6

-7

Scenario 3: Accident costs

0

-1

-1

-1

-2

-2

-3

-3

-3

-3

-4

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

0

-0

-0

-0

-1

-2

-2

-3

-3

-3

-4

Scenario 2: Delay costs

0

-3

-3

-3

-3

-4

-4

-5

-5

-5

-5

Scenario 3: Delay costs

0

-4

-4

-4

-4

-5

-5

-6

-6

-6

-6

Lighting analysis (£m)

Scenario 1: Lighting accident costs

0

-0

-1

-1

-1

-1

-2

-2

-2

-2

-2

Scenario 2: Lighting accident costs

0

-0

-0

-1

-1

-1

-1

-2

-2

-2

-2

Scenario 3: Lighting accident costs

0

-0

-0

-1

-1

-1

-1

-2

-2

-2

-2

CO2 Emissions (£m)

Scenario 1: CO2 costs

0

-4

-8

-13

-17

-22

-26

-31

-36

-41

-46

Scenario 2: CO2 costs

-0

-5

-9

-14

-18

-23

-28

-33

-38

-44

-49

Scenario 3: CO2 costs

-1

-5

-10

-14

-19

-24

-29

-34

-40

-45

-50

Table E.10 Discounted annual costs compared to Base Case: 2021/22 to 2030/31

Item

Year

2021/22

22/23

23/24

24/25

25/26

26/27

27/28

28/29

29/30

30/31

Total Agency Costs (£m)

Scenario 1: Base case

-45

-48

-51

-54

-57

-60

-63

-65

-68

-70

Scenario 2: 20% cut

-60

-59

-58

-57

-57

-58

-59

-59

-60

-61

Scenario 3: 40% cut

-75

-70

-65

-61

-57

-58

-59

-59

-60

-61

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

-897

-975

-1,052

-1,128

-1,202

-1,271

-1,340

-1,407

-1,472

-1,537

Scenario 2: Vehicle operating costs

-871

-950

-1,027

-1,104

-1,178

-1,250

-1,319

-1,388

-1,456

-1,522

Scenario 3: Vehicle operating costs

-853

-933

-1,011

-1,087

-1,162

-1,235

-1,306

-1,376

-1,445

-1,512

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

-4

-5

-5

-5

-6

-6

-6

-6

-7

-7

Scenario 2: Travel time costs

-1

-1

-1

-1

-2

-2

-3

-3

-4

-4

Scenario 3: Travel time costs

2

2

1

1

1

0

-0

-1

-1

-2

Skid resistance analysis (£m)

Scenario 1: Accident costs

-7

-8

-8

-9

-9

-10

-10

-10

-11

-11

Scenario 2: Accidents costs

-7

-8

-8

-9

-9

-10

-10

-10

-11

-11

Scenario 3: Accident costs

-5

-6

-7

-8

-9

-10

-10

-10

-11

-11

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

-4

-4

-4

-4

-4

-5

-5

-5

-5

-5

Scenario 2: Delay costs

-5

-5

-5

-5

-5

-5

-5

-5

-5

-5

Scenario 3: Delay costs

-6

-5

-5

-5

-5

-5

-5

-5

-5

-5

Lighting analysis (£m)

Scenario 1: Lighting accident costs

-3

-3

-3

-3

-3

-4

-4

-4

-4

-4

Scenario 2: Lighting accident costs

-3

-3

-3

-3

-3

-4

-4

-4

-4

-4

Scenario 3: Lighting accident costs

-3

-3

-3

-3

-3

-4

-4

-4

-4

-4

CO2 Emissions (£m)

Scenario 1: CO2 costs

-51

-56

-61

-66

-71

-74

-78

-81

-85

-89

Scenario 2: CO2 costs

-54

-59

-63

-68

-73

-76

-80

-83

-87

-91

Scenario 3: CO2 costs

-55

-60

-65

-69

-74

-77

-81

-84

-87

-92

Table E.11 Cumulative discounted costs: 2010/11 to 2020/21

Item

Year

2010/11

11/12

12/13

13/14

14/15

15/16

16/17

17/18

18/19

19/20

20/21

Total Agency Costs (£m)

Scenario 1: Base case

141

278

410

538

661

780

895

1,006

1,114

1,217

1,318

Scenario 2: 20% cut

114

224

330

433

532

628

720

810

896

980

1,060

Scenario 3: 40% cut

85

168

247

324

399

471

540

607

672

735

795

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

4,294

8,492

12,595

16,605

20,540

24,400

28,186

31,899

35,532

39,086

42,563

Scenario 2: Vehicle operating costs

4,294

8,495

12,605

16,625

20,573

24,448

28,252

31,985

35,640

39,219

42,723

Scenario 3: Vehicle operating costs

4,294

8,498

12,612

16,638

20,594

24,480

28,296

32,041

35,712

39,307

42,829

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

21

42

62

81

100

119

137

155

173

191

208

Scenario 2: Travel time costs

21

42

63

84

104

125

146

167

188

209

229

Scenario 3: Travel time costs

21

42

64

85

107

129

152

174

197

220

244

Skid resistance analysis (£m)

Scenario 1: Accident costs

23

45

66

86

106

125

143

161

179

195

211

Scenario 2: Accidents costs

23

45

66

86

106

125

143

161

179

195

211

Scenario 3: Accident costs

23

45

67

88

109

129

149

169

189

208

227

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

9

17

26

34

42

48

55

61

66

71

76

Scenario 2: Delay costs

9

15

21

26

32

36

41

45

49

53

56

Scenario 3: Delay costs

9

13

18

22

27

30

34

37

39

42

45

Lighting analysis (£m)

Scenario 1: Lighting accident costs

8

17

24

32

39

46

53

60

66

72

78

Scenario 2: Lighting accident costs

8

17

25

32

40

47

54

60

67

73

79

Scenario 3: Lighting accident costs

8

17

25

33

40

47

54

61

68

74

80

CO2 Emissions (£m)

Scenario 1: CO2 costs

320

636

948

1,256

1,559

1,857

2,151

2,440

2,724

3,003

3,276

Scenario 2: CO2 costs

320

635

946

1,253

1,554

1,851

2,143

2,430

2,712

2,989

3,260

Scenario 3: CO2 costs

319

634

945

1,251

1,552

1,847

2,138

2,424

2,705

2,980

3,250

Table E.12 Cumulative discounted costs: 2021/22 to 2030/31

Item

Year

2021/22

22/23

23/24

24/25

25/26

26/27

27/28

28/29

29/30

30/31

Total Agency Costs (£m)

Scenario 1: Base case

1,415

1,508

1,599

1,686

1,770

1,852

1,931

2,007

2,081

2,152

Scenario 2: 20% cut

1,142

1,225

1,308

1,392

1,476

1,560

1,643

1,725

1,806

1,886

Scenario 3: 40% cut

861

933

1,009

1,089

1,174

1,257

1,340

1,422

1,503

1,584

Vehicle operating costs due to surface condition deterioration (£m)

Scenario 1: Vehicle operating costs

45,961

49,280

52,522

55,688

58,780

61,803

64,757

67,645

70,466

73,223

Scenario 2: Vehicle operating costs

46,146

49,490

52,757

55,947

59,063

62,107

65,082

67,988

70,827

73,599

Scenario 3: Vehicle operating costs

46,269

49,630

52,914

56,120

59,252

62,311

65,299

68,217

71,066

73,848

Increase in travel time costs due to surface conditions (£m)

Scenario 1: Travel time costs

224

241

257

273

288

303

318

333

347

362

Scenario 2: Travel time costs

250

270

290

310

329

348

366

384

401

419

Scenario 3: Travel time costs

267

289

312

334

355

377

397

417

437

456

Skid resistance analysis (£m)

Scenario 1: Accident costs

227

242

256

270

284

297

310

322

334

345

Scenario 2: Accidents costs

227

242

256

270

284

297

310

322

334

345

Scenario 3: Accident costs

245

262

277

292

305

318

331

343

355

366

Delay costs at (carriageway) roadworks (£m)

Scenario 1: Delay costs

81

86

91

95

100

104

107

111

115

119

Scenario 2: Delay costs

60

64

67

71

75

79

83

86

90

94

Scenario 3: Delay costs

48

51

55

58

62

66

70

73

77

81

Lighting analysis (£m)

Scenario 1: Lighting accident costs

84

90

95

100

105

110

115

119

124

128

Scenario 2: Lighting accident costs

85

91

96

101

106

111

116

120

125

129

Scenario 3: Lighting accident costs

86

92

97

102

107

112

117

122

126

130

CO2 Emissions (£m)

Scenario 1: CO2 costs

3,545

3,809

4,068

4,322

4,572

4,817

5,060

5,299

5,534

5,765

Scenario 2: CO2 costs

3,526

3,788

4,045

4,297

4,544

4,788

5,029

5,266

5,499

5,729

Scenario 3: CO2 costs

3,515

3,775

4,031

4,281

4,528

4,770

5,010

5,246

5,479

5,707

Table E.13 Cumulative undiscounted total costs

Year

Total Road User and Impact Costs (analysed in this study) (£m)

Total Transport Cost (Cumulative) - Sum of agency and analysed road user and impact costs (£m)

Scenario 1:
Base case

Scenario 2:
20% cut

Scenario 3:
40% cut

Scenario 1:
Base case

Scenario 2:
20% cut

Scenario 3:
40% cut

2010/11

4,675

4,675

4,674

4,816

4,788

4,760

2011/12

9,408

9,409

9,409

9,691

9,636

9,580

2012/13

14,199

14,204

14,209

14,623

14,546

14,465

2013/14

19,048

19,061

19,073

19,614

19,517

19,415

2014/15

23,973

23,999

24,020

24,680

24,568

24,447

2015/16

28,973

29,016

29,050

29,822

29,699

29,562

2016/17

34,050

34,113

34,163

35,040

34,910

34,761

2017/18

39,203

39,290

39,360

40,334

40,201

40,042

2018/19

44,422

44,538

44,630

45,695

45,563

45,398

2019/20

49,709

49,858

49,975

51,123

50,996

50,829

2020/21

55,062

55,248

55,395

56,618

56,500

56,334

2021/22

60,477

60,701

60,878

62,175

62,072

61,913

2022/23

65,954

66,217

66,423

67,793

67,713

67,566

2023/24

71,493

71,796

72,031

73,473

73,422

73,293

2024/25

77,094

77,438

77,702

79,215

79,200

79,094

2025/26

82,756

83,142

83,435

85,019

85,045

84,969

2026/27

88,488

88,914

89,235

90,892

90,963

90,914

2027/28

94,290

94,755

95,102

96,836

96,952

96,929

2028/29

100,163

100,665

101,036

102,850

103,014

103,016

2029/30

106,106

106,643

107,037

108,935

109,148

109,173

2030/31

112,117

112,687

113,103

115,088

115,353

115,399

Table E.14 Cumulative discounted total costs

Year

Total Road User and Impact Costs (analysed in this study) (£m)

Total Transport Cost (Cumulative) - Sum of agency and analysed road user and impact costs (£m)

Scenario 1:
Base case

Scenario 2:
20% cut

Scenario 3:
40% cut

Scenario 1:
Base case

Scenario 2:
20% cut

Scenario 3:
40% cut

2010/11

4,675

4,675

4,674

4,816

4,788

4,760

2011/12

9,248

9,248

9,249

9,526

9,472

9,417

2012/13

13,720

13,725

13,730

14,131

14,055

13,977

2013/14

18,094

18,106

18,117

18,631

18,539

18,441

2014/15

22,386

22,409

22,428

23,047

22,941

22,827

2015/16

26,596

26,633

26,663

27,376

27,261

27,134

2016/17

30,726

30,780

30,823

31,621

31,500

31,363

2017/18

34,776

34,849

34,907

35,782

35,659

35,514

2018/19

38,740

38,834

38,909

39,853

39,730

39,581

2019/20

42,619

42,737

42,831

43,836

43,717

43,566

2020/21

46,414

46,559

46,673

47,731

47,619

47,469

2021/22

50,123

50,294

50,429

51,537

51,436

51,290

2022/23

53,747

53,944

54,099

55,256

55,169

55,031

2023/24

57,289

57,511

57,684

58,887

58,819

58,693

2024/25

60,749

60,996

61,188

62,435

62,388

62,277

2025/26

64,128

64,401

64,610

65,899

65,878

65,783

2026/27

67,434

67,730

67,955

69,286

69,290

69,212

2027/28

70,667

70,985

71,224

72,598

72,628

72,564

2028/29

73,829

74,166

74,418

75,836

75,891

75,840

2029/30

76,920

77,276

77,540

79,001

79,082

79,043

2030/31

79,941

80,314

80,588

82,093

82,200

82,172