Summary of Effects
This chapter summarises the environmental impacts that have been identified within this ES which are presented in Table 10.1 to Table 10.6. The table cross references mitigation identified in Table 11.1 to Table 11.11 to reduce the impacts then details the significance of the effect post mitigation. Impacts and effects are adverse unless otherwise stated. Those residual effects that are considered to be significant are shown in bold in the “Significance” column of the tables.
The tables identify significant residual effects for demolition of the historic masonry bridge; unrecorded remains at Lagganbane; loss of ancient woodland; loss of Daubenton’s bat and soprano pipistrelle bat roost; construction effects on Allt Lagain Bhain and cumulative construction effects on ecology and the water environment.
Potential Impact | Mitigation no. | Value/sensitivity of receptor | Duration of impact | Magnitude | Significance |
---|---|---|---|---|---|
Demolition of trunk road bridge | 8 | Low | Permanent | Major | Slight |
Demolition of historic masonry bridge | 5, 6, 7, 8 | Medium | Permanent | Major | Moderate |
Disturbance or damage to Chapel, Torgyle house and Glenmoriston footprints during works | 3, 4, 8 | Medium | Temporary | No change | Neutral |
Disturbance or damage to unrecorded remains at Lagganbane | 3, 4, 6, 8 | Medium | Temporary Permanent | Minor to Moderate | Slight to Moderate |
Potential Impact | Mitigation no. | Value/sensitivity of receptor | Duration of impact | Magnitude | Significance |
---|---|---|---|---|---|
Potential to impact designated sites | 1, 2, 12, 43 | International | Temporary | See Appendix D | Not significant |
Loss of ancient woodland and trees. | 9, 43 | County | Permanent | See Appendix D | Significant at County scale |
Impact on juniper | 10 | Local | Permanent | See Appendix D | Not significant |
Disturbance of otter | 13,14,15,16,17,18,19,20 | County | Temporary | See Appendix D | Not significant |
Loss of Daubenton's bat roost | 13,18, 21, 22, 23, 24, 25, 26, 27, 28 | County | Permanent | See Appendix D | Significant at County scale but with potential to be not significant |
Loss of soprano pipistrelle bat roost | 13,18, 21, 22, 23, 24, 25, 26, 27, 28 | Local | Permanent | See Appendix D | Significant at Local scale with potential to be not significant |
Potential to disturb / affect freshwater pearl mussels | 13, 29, 31 | Local (Allt Lagain Bhain and River Moriston to 150 m downstream of confluence). International (rest of River Moriston) | Temporary | See Appendix D | Not significant |
Impact on pine marten | 20, 32 | County | Temporary | See Appendix D | Not significant |
Impact on Atlantic salmon | 13, 29, 31, 33, 34, 62 | Regional | Temporary | See Appendix D | Not significant |
Disturbance of badger | 13, 20, 35, 36, 37, 38 | Local | Temporary | See Appendix D | Not significant |
Disturbance of breeding birds | 13, 39, 40, 41 | Local | Permanent | See Appendix D | Not significant |
Damage to wood ant colonies | 13, 42 | Local | Temporary | See Appendix D | Not significant |
Potential Impact | Mitigation no. | Value/sensitivity of receptor | Duration of impact | Magnitude | Significance |
---|---|---|---|---|---|
Loss of trees | 48 | N/A | Permanent | Negligible | Neutral |
Reprofiling of land | 45 | N/A | Temporary | Moderate | Slight Adverse |
Widening of trunk road/bridge | 43, 47 | N/A | Permanent | Negligible | Neutral |
Loss of old masonry bridge | None achievable | N/A | Permanent | Major | Moderate Adverse |
Construction | 44, 46, 49 | N/A | Temporary | Negligible | Neutral |
Potential Impact | Mitigation no. | Value/sensitivity of receptor | Duration of impact | Magnitude | Significance |
---|---|---|---|---|---|
Allt Lagain Bhain - Decrease in water quality from site runoff | 31, 50, 52, 54, 55, 56, 57, 58, 59, 60, 61, 62, 66, 68, 70, 81 | Very High (downstream of road bridge). High (upstream of road bridge) | Temporary | Minor | Moderate (downstream of road bridge). Slight (upstream of road bridge) |
River Moriston - Decrease in water quality from site runoff | 31, 50, 52, 54, 55, 56, 57, 58, 59, 60, 61, 62, 66, 68, 70, 81 | Very High | Temporary | Negligible | Neutral |
Un-named burn - Decrease in water quality from site runoff | 31, 50, 52, 55, 56, 57, 58, 59, 60, 61, 62, 70, 81 | Medium | Temporary | Minor | Slight |
Allt Lagain Bhain - Restriction of flows | 54 | High | Temporary | Minor | Slight |
Allt Lagain Bhain - Disturbance of banks | 53, 58, 64 | High | Temporary /permanent | Minor, temporary | Slight |
Allt Lagain Bhain - Increased scour and subsequent deposition in burn | 51 | High | Temporary/permanent | Minor | Slight |
River Moriston - Increased deposition resulting from scour of Allt Lagain Bhain banks and bed and transport of sediments downstream to river | 51 | Medium | Temporary/permanent | Minor | Slight |
Allt Lagain Bhain flood area - Increased surface water runoff from working area leading to elevated watercourse flows | 63 | Low | Temporary | Negligible | Neutral |
River Moriston floodplain - Increased surface water runoff from working area leading to elevated watercourse flows | 63 | High | Temporary | Negligible | Neutral |
Potential Impact | Mitigation no. | Value/sensitivity of receptor | Duration of impact | Magnitude | Significance |
---|---|---|---|---|---|
Allt Lagain Bhain - Decrease in water quality from site runoff | 63 | Very High | Permanent | Negligible | Neutral |
River Moriston - Decrease in water quality from site runoff | 63 | Very High | Permanent | Negligible | Neutral |
Small un-named burn - Decrease in water quality from site runoff | 63 | Medium | Permanent | Negligible | Neutral |
Allt Lagain Bhain - Spillage from vehicular collision resulting in pollution to burn | 63 | Very High | Permanent | Negligible | Neutral |
Allt Lagain Bhain -Changes in flood risk | 70 | Low | Permanent | Negligible | Neutral |
Changes in flow pathway at new crossing structure | 70, 71 | High | Permanent | Negligible beneficial | Neutral |
Allt Lagain Bhain - Changes in scour and deposition | 71, 72 | High | Permanent | Negligible | Neutral |
Allt Lagain Bhain -Change in planform of channel | 71, 72 | High | Permanent | Negligible beneficial | Neutral |
Potential Impact | Mitigation no. | Value/sensitivity of receptor | Duration of impact | Magnitude | Significance |
---|---|---|---|---|---|
Potential for in-combination effects on ecology if A887 Allt na h-Innse Beag scheme is constructed at the same time as the proposed scheme. | 95 | Up to Very High | Temporary | Minor to Moderate | Moderate if construction phases for both schemes are simultaneous. |
Potential for in-combination effects on the water environment if A887 Allt na h-Innse Beag scheme is constructed at the same time as the proposed scheme. | 95 | Up to Very High | Temporary | Minor to Moderate | Moderate if construction phases for both schemes are simultaneous. |