Scheme Objectives
Transport Scotland is committed to delivering economic growth through improved road safety and quicker and more reliable journey times, as well as providing better links to public transport and active travel facilities. In addition to the A9 Dualling Programme objectives, Community objectives were also identified during the A9 Co-Creative Process by the Birnam to Ballinluig A9 Community Group. Both the A9 Dualling and Community objectives have informed the design development and Environmental Impact Assessment (EIA) undertaken for the proposed scheme.
A9 Dualling Programme Objectives
The A9 Dualling Programme objectives are to:
- Improve the operational performance of the A9 by:
- Reducing journey times; and
- Improving journey time reliability.
- Improve safety for motorised and non-motorised users by:
- Reducing accident severity; and
- Reducing driver stress.
- Facilitate active travel within the corridor; and
- Improve integration with public transport facilities.
Community Objectives
During the A9 Co-Creative Process, the Birnam to Ballinluig A9 Community Group identified the following community objectives for the proposed scheme.
- Reduce current levels of noise and pollution in the villages of Dunkeld, Birnam and Inver to protect human health, and well-being of residents and visitors and to enable them to peacefully enjoy their properties and amenity spaces.
- Provide better, safer access on and off the A9 from both sides of the road ensuring easy, safe movement of vehicular traffic and non-motorised users through the villages, helping to reduce stress and anxiety and support the local economy.
- Examine and identify opportunities to enhance the levels of wheeling, cycling and walking for transport and leisure, including the improvement of existing footpaths and cycle ways, to promote positive mental health and well-being.
- Protect and enhance the scenic beauty and natural heritage of the area and its distinctive character and quality.
- Promote long term and sustainable economic growth within Dunkeld and Birnam and the surrounding communities.
- Ensure that all local bus, intercity bus services and train services are maintained and improved.
- Preserve and enhance the integrity of the unique and rich historical and cultural features of the Dunkeld, Birnam and Inver communities, thereby supporting well-being and the local economy.
Both the A9 Dualling Programme Objectives and the Community Objectives informed the Environmental Impact Assessment (EIA) undertaken for the proposed scheme.