Contents: Volume 2 (Figures)
Contents: Volume 2 (Figures)
Figures are only available in pdf format
Part 1: The Scheme
Figure 2.1 Existing Road Network, Northern Study Area (5.9mb)
Figure 2.2 Existing Road Network, Southern Study Area (3.9mb)
Figure 2.3 Existing AADT Flows North of the Firth of Forth (3.8mb)
Figure 2.4 Observed Accident Locations (2000 – 2007) – North (4.9mb)
Figure 2.5 Existing AADT Flows South of the Firth of Forth (4mb)
Figure 2.6 Observed Accident Locations (2000 – 2007) – South (6.5mb)
Figure 3.1 North Corridor Option 1, Location Plan (5.8mb)
Figure 3.2 North Corridor Option 2, Location Plan (5.7mb)
Figure 3.3 South Corridor Option 1, Location Plan (4.1mb)
Figure 3.4 South Corridor Option 2, Location Plan (4.2mb)
Part 2: Engineering Assessment
Figure 4.1A North Corridor Option 1, Plan and Profile, Ch. 6850 - Ch. 9750, Sheet 1 of 2 (1.4mb)
Figure 4.1B North Corridor Option 1, Plan and Profile, Ch. 9750 - Ch. 12210, Sheet 2 of 2 (1.2mb)
Figure 4.2 North Corridor Option 1, Ferrytoll Junction (628k)
Figure 4.3 North Corridor Option 1, Masterton Junction (1.8mb)
Figure 4.4A North Corridor Option 1, Earthworks, Plan and Profile, Ch. 6850 - Ch. 9750, Sheet 1 of 2 (1.5mb)
Figure 4.4B North Corridor Option 1, Earthworks, Plan and Profile, Ch. 9750 - Ch. 12110, Sheet 2 of 2 (1.2mb)
Figure 4.5 North Corridor Option 1, Structures Location Plan (5.9mb)
Figure 4.6A North Corridor Option 2, Plan and Profile, Ch. 6850 - Ch. 9750, Sheet 1 of 2 (1.4mb)
Figure 4.6B North Corridor Option 2, Plan and Profile, Ch. 9750 - Ch. 12110, Sheet 2 of 2 (1.2mb)
Figure 4.7 North Corridor Option 2, Ferrytoll Junction (600k)
Figure 4.8 North Corridor Option 2, A90/M90 Link (520k)
Figure 4.9A North Corridor Option 2, Earthworks, Plan and Profile, Ch. 6850 - Ch. 9750, Sheet 1 of 2 (1.5mb)
Figure 4.9B North Corridor Option 2, Earthworks, Plan and Profile, Ch. 9750 - Ch. 12110, Sheet 2 of 2 (1.2mb)
Figure 4.10 North Corridor Option 2, Structures Location Plan (5.9mb)
Figure 4.11 South Corridor Option 1, Plan and Profile, Ch. 0 - Ch. 3100, Sheet 1 of 1 (1.3mb)
Figure 4.12 South Corridor Option 1, Echline/Scotstoun Combination Junction (1.4mb)
Figure 4.13 South Corridor Option 1, M9 Junction 1a (560k)
Figure 4.14 South Corridor Option 1, Earthworks, Plan and Profile, Ch. 0 - Ch. 2800, Sheet 1 of 1 (1.4mb)
Figure 4.15 South Corridor Option 1, Structures Location Plan (4.3mb)
Figure 4.16A South Corridor Option 2, Plan and Profile, Ch. 0 - Ch. 3150, Sheet 1 of 2 (768k)
Figure 4.16B South Corridor Option 2, Plan and Profile, Ch. 3150 - Ch. 6000, Sheet 2 of 2 (872k)
Figure 4.17 South Corridor Option 2, M9 Junction, (Encompassing M9 Junction 1a) (984k)
Figure 4.18 South Corridor Option 2, Scotstoun Junction (1.2mb)
Figure 4.19 South Corridor Option 2, A904 Junction (984k)
Figure 4.20A South Corridor Option 2, Earthworks, Plan and Profile, Ch. 0 - Ch. 2900, Sheet 1 of 2 (1.1mb)
Figure 4.20B South Corridor Option 2, Earthworks, Plan and Profile, Ch. 2900 - Ch. 4850, Sheet 2 of 2 (1mb)
Figure 4.21 South Corridor Option 2, Structures Location Plan (4.3mb)
Part 3: Environmental Assessment
Figure 5.1 Study Area (2.5mb)
Figure 6.1 Agricultural Land Use (3.2mb)
Figure 6.2 General Land Use (4mb)
Figure 7.1 Contaminated Land (4mb)
Figure 7.2 Geological Constraints (3.8mb)
Figure 7.3 Hydrogeological Constraints (6.6mb)
Figure 8.1 Water Features (4mb)
Figure 8.2 Surface Water Hydrology (2.6mb)
Figure 8.3 200 Year Flood Risk (4mb)
Figure 9.1 Phase 1 Habitat (4.6mb)
Figure 9.2 Designated Conservation Sites (4mb)
Figure 10.1 Local Landscape Character Areas (2.8mb)
Figure 10.2 Landscape Character Area Photos (6.8mb)
Figure 10.3 Landscape Constraints (3.5mb)
Figure 11.1 Visual Impacts Forth Replacement Bridge (2.3mb)
Figure 11.2 Visual Impacts North Corridor Option 1 (2.6mb)
Figure 11.3 Visual Impacts North Corridor Option 2 (2.6mb)
Figure 11.4 Visual Impacts South Corridor Option 1 (1.2mb)
Figure 11.5 Visual Impacts South Corridor Option 2 (1.2mb)
Figure 12.1 Location of Features of Cultural Heritage Importance (1:10k) (6.3mb)
Figure 12.2 Overview of Features of Cultural Heritage Importance (1:50k) (2.2mb)
Figure 12.3 Historical Landscape Assessment (3.3mb)
Figure 13.1 SSSIs and Built Receptors at Sensitive Locations (3.9mb)
Figure 13.2 Property Counts (3.6mb)
Figure 14.1 Do Minimum, 2017 (3.9mb)
Figure 14.2 Design Year, 2032, Corridor Option N1S1 (3.9mb)
Figure 14.3 Design Year, 2032, Corridor Option N1S2 (3.9mb)
Figure 14.4 Design Year, 2032, Corridor Option N2S1 (3.9mb)
Figure 14.5 Design Year, 2032, Corridor Option N2S2 (4mb)
Figure 14.6 Difference between Design Year, 2032 and Do Minimum, 2017, Corridor Option N1S1 (4mb)
Figure 14.7 Difference between Design Year, 2032 and Do Minimum, 2017, Corridor Option N1S2 (4mb)
Figure 14.8 Difference between Design Year, 2032 and Do Minimum, 2017, Corridor Option N2S1 (4mb)
Figure 14.9 Difference between Design Year, 2032 and Do Minimum, 2017, Corridor Option N2S2 (4mb)
Figure 15.1 Route Corridor Option Conflicts with Paths/Cycleways and Links to Community Facilities, North Corridor Option 1 (2.8mb)
Figure 15.2 Route Corridor Option Conflicts with Paths/Cycleways and Links to Community Facilities, North Corridor Option 2 (2.8mb)
Figure 15.3 Route Corridor Option Conflicts with Paths/Cycleways and Links to Community Facilities, South Corridor Option 1 (1.3mb)
Figure 15.4 Route Corridor Option Conflicts with Paths/Cycleways and Links to Community Facilities, South Corridor Option 2 (1.3mb)
Figure 15.5 Indicative Community Catchment Areas (2.3mb)
Part 4: Traffic and Economic Assessment
Figure 19.1 Forecast Change in Population between 2005 and 2017 (904k)
Figure 19.2 Forecast Change in Employment between 2005 and 2017 (924k)
Figure 19.3 Forecast Change in Population between 2005 and 2022 (892k)
Figure 19.4 Forecast Change in Employment between 2005 and 2022 (900k)
Figure 19.5 Annual Average Daily Traffic Flows 2005 (816k)
Figure 19.6 Forecast Annual Average Daily Traffic Flows 2017 (812k)
Figure 20.1 North Corridor Option 1 Annual Average Daily Traffic Flows (3.9mb)
Figure 20.2 North Corridor Option 2 Annual Average Daily Traffic Flows (3.9mb)
Figure 20.3 South Corridor Option 1 Annual Average Daily Traffic Flows (4mb)
Figure 20.4 South Corridor Option 2 Annual Average Daily Traffic Flows (4mb)