Transport and Travel in Scotland 2014

Table TD6: [Duration] Percentage of journeys made by duration of journey, 2004-2014

Table TD6: [Duration] Percentage of journeys made by duration of journey, 2004-2014
2004 2005 2006 2007 1 2008 2009 2010 2011 2012 2 2013 2014
  column percentages
Less than 5 min 1.6 1.5 1.6 6.2 6.9 6.3 5.5 5.1 4.5 4.1 3.7
5 to 10 min 26.6 26.3 24.4 39.6 39.4 38.4 36.4 37.7 40.1 38.3 38.1
11 to 20 min 30.1 29.6 30.6 26.6 26.9 25.9 26.9 26.4 26.9 28.1 28.3
21 to 30 min 18.2 18.0 18.1 12.5 12.4 12.8 13.5 14.2 13.4 14.2 13.9
31 to 60 min 14.8 15.3 15.6 10.5 10.0 10.8 11.5 11.1 10.8 10.9 11.8
61 to 120 min 5.1 5.3 5.7 3.3 3.1 3.7 4.1 3.7 3.0 3.1 3.0
121 to 179 min 1.1 1.1 1.3 0.4 0.4 0.6 0.7 0.6 0.4 0.4 0.4
180 min and over 2.5 2.9 2.7 0.8 0.9 1.5 1.4 1.2 0.9 0.8 0.8
Sample size (=100%) 27,120 24,640 25,200 20,520 20,450 18,680 16,300 17,590 19,740  20,180  19,930

1 Prior to 2007 only journeys over 1/4 mile or 5 minutes on foot were recorded.  Since 2007 all journeys are recorded.  This creates a distcontinuity in the time series between 2006 and 2007.
2 The questionnaire was changed in 2012 and as a result more walking journeys are recorded so there is a break in the time series between 2011 and 2012.