Appendix A – 2026/27 Trunk road casualty reduction programme
South East Operating Company Unit
The following table gives details of the schemes and investigations carried out on the South East Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 3 (Safe Roads and Roadsides) and Strategic Action 11 (Infrastructure/Engineering).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| M9 | M9 South of Birkhill Road Bridge Fatal Site | Investigation | Other collision investigation |
| All | All SE fatal collision study | Investigation | Cluster site |
| A7 | A7 Selkirk Pedestrian Review | Design/Construction | Stakeholder engagement |
| A720 | A720/M8 KSI Review | Investigation | Cluster site |
| M9 | M9 Route Improvement Study | Investigation | Cluster site |
| A1 | A1 junction study - Torness to The Border | Investigation/Design /Construction | Route site |
| A985 | A985 Route Improvement Study | Investigation | Route site |
| A6091 | A6091 Route Improvement Study | Investigation/Design | Route site |
| All SE | Roadside Improvement - Safe Systems Approach | Investigation | Route Risk Scoring Tool |
| A7 | A7 Hawthorns to Boleside Road Vehicle Restraint System (VRS) | Construction | Route Risk Scoring Tool |
| A68 | A68 KSI study | Design/Construction | Route site |
| A702 | A702 KSI study | Investigation/Design /Construction | Route site |
| M9 | M9 Northbound Jct 9 to Jct 10 - Residual Tree Removal | Design/Construction | Route Risk Scoring Tool |
| A985 | A985 Eastbound area 51 to 65 | Investigation/Design /Construction | Route Risk Scoring Tool |
| A985 | A985 Westbound area 10 to 17 | Design/Construction | Route Risk Scoring Tool |
| A985 | A985 Westbound area 42 to 48 | Design/Construction | Route Risk Scoring Tool |
| A7 | A7 Kingsnowe roundabout | Construction | Cluster site |
| A7 | A7 Galalaw roundabout | Design/Construction | Cluster site |
| A985 | A985 Cairneyhill roundabout At D13 | Construction | Cluster site |
| M8/A720 | M8/A720 at Hermiston Interchange | Design/Construction | Cluster site |
| A68 | A68 Ravenswood roundabout to Layby at Little Linn (Roadside Improvement Strategy) | Design/Construction | Route Risk Scoring Tool |
| A68 | A68 Lauder Barns Cottage to Lauder South Gateway (Roadside Improvement Strategy) | Design/Construction | Route Risk Scoring Tool |
| A985 | A985 Fairykirk Road to Admiralty roundabout (Roadside Improvement Strategy) | Design/Construction | Route Risk Scoring Tool |
| A985 | A985 Drumfin Cottage (Roadside Improvement Strategy) | Design/Construction | Route Risk Scoring Tool |
| A702 | A702 Erraid Cottage to Glencross (Roadside Improvement Strategy) | Design/Construction | Route Risk Scoring Tool |
| A823 | A823(m) Areas 1-3 | Design/Construction | Route Risk Scoring Tool |
| A720 | A720 Sherifhall to old Craighall | Design/Construction | Route site |
| M8 | M8 Jct 3 to Jct 3a | Design/Construction | Route site |
| M876 | M876 Jct 1 Westbound onslip at Larbert Road | Design/Construction | Cluster site |
| M8 | M8 Jct 3A Westbound onslip | Design/Construction | Cluster site |
| M8 | M8 Eastbound at J4 | Design | Cluster site |
| A720 | A720 Gilmerton Jct | Design | Cluster site |
| A720 | A720 East of Baberton | Design | Cluster site |
| A702 | A702 - Melbourne to A72 Skirling Junction | Design | Route Site |
| A720 | A720 Calder Jct | Design | Cluster site |
| A1 | A1 Spott Roundabout | Design | Stakeholder engagement |
| A702 | A702 Review of 40mph settlements for consistency | Design/Construction | Speed limit assessment |
| M9 | M9 - KSI Reduction - Verge Improvement - SB Area 31 | Design/Construction | Route site |
| A985 | A985 - B9156 Dunfermline to Kings Road Roundabout | Design/Construction | Route site |
| A68 | A68 Station Bridge to Jct A698 Kelso | Design | Route site |
| M8 | M8 J2 to Hermiston Roundabout | Design | Route site |
| M90 | M90 A823m to Admiralty | Design | Route site |
| A702 | A702 C40 Bushloan Road to A703 Peebles Road | Design | Route site |
| A68 | A68 B6458 Saughland Rd to N end Of Hope Imp | Design | Route site |
| A702 | A702 C41 Bellwood Rd to U71 Glencorse Kirk Rd | Design | Route site |
| M8 | M8 J5 Shotts - Ponding Issues and Roadside Improvement | Construction | Stakeholder engagement |
| M90 | M90 at J1 Scotstoun | Investigation | Route site |
| M90 | M90 J2 to J3 | Investigation | Route site |
| A1 | A1 Lamberton to Burnmouth | Investigation | Route site |
| M876 | M876 Between M80 J8 and M876 J1. | Investigation | Route site |
| M90 | M90 Slip from A92 At Halbeath | Investigation | Route site |
| A7 | A7 Selkirk to Galashiels | Investigation | Route site |
| A7 | A7 Newstead to Langholm | Investigation | Route site |
| M8 | M8 eastbound - West of River Almond bridge | Investigation | Cluster site |
| M8 | M8 westbound approaching J3A | Investigation | Cluster site |
| A68 | A68 Ancrum to Fairnington Jct | Investigation/Design | Route Risk Scoring Tool |
| A985 | A985 Kincardine Junction | Investigation/Design | Route Risk Scoring Tool |
| A702 | A702 North of Lamington to Overburn Cottages | Investigation/Design | Route Risk Scoring Tool |
| A7 | A7 North of Hawick | Investigation/Design | Route Risk Scoring Tool |
The following table gives details of the schemes and investigations carried out on the South East Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 3 (Safe Roads and Roadsides) and Strategic Action 7 (Knowledge and Data Analysis).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| A720 | A720 City Bypass Model | Investigation | Stakeholder engagement |
The following table gives details of the schemes and investigations carried out in the South East Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 2 (Safe Roads and Roadsides) and Strategic Action 11 (Infrastructure/Engineering).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| All SE | All SE 20 mph speed limit implementation | Construction | National 20mph programme |
| A68 | A68 Camptown Speed Survey | Construction | Stakeholder engagement |
North West Operating Company Unit
The following table gives details of the schemes and investigations carried out on the North West Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 3 (Safe Roads and Roadsides) and Strategic Action 11 (Infrastructure/Engineering).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| A9 | Trinafour Junction Signing & Road Markings | Construction | Stakeholder engagement |
| A9 | A9 Short term measures Mobile VMS | Construction | A9 Short Term Measures programme |
| A9 | A9/A86 Kingussie Junction Signing & Bollards | Construction | Other collision investigation |
| A9 | Dalnaspidal Junction Safety Improvements | Design | Route site |
| A9 | House of Bruar Junction Signing Improvements | Design | Cluster site / Stakeholder engagement |
| A9 | Hermitage to Bankfoot Signing | Design | Stakeholder engagement |
| A9 | A835 Tore Roundabout Signalisation | Design | Cluster site / Stakeholder engagement |
| A9 | Sir Walter Scott Drive Junction & Inshes SB | Construction | Other collision investigation |
| A9 | Findon Junction Improvements | Design/Construction | Cluster site |
| A9 | North Kessock Junction Safety Scheme | Design/Construction | Route site |
| A9 | Tore Roundabout to Thurso Safety Improvements | Investigation | Route site - follow on from A9 Short term measures (Perth to Inverness) |
| A82 | Loch Lomondside Lay-bys Improvements | Design | Other collision investigation |
| A82 | Glen Etive Junction Signing | Design/Construction | Other collision investigation |
| A82 | Loch Lomondside Tourist Signing | Design/Construction | Other collision investigation |
| A82 | Achintore Road uncontrolled crossing and VAS | Design/Construction | Stakeholder engagement |
| A82 | Lomondgate to Luss Junction Modelling & Options | Design | Stakeholder engagement |
| A82 | Tyndrum Cemetery Corner | Design/Construction | Stakeholder engagement |
| A82 | Tyndrum to Glencoe Route Measures | Design | Route site |
| A82 | A82 Stoneymollan to Luss Junctions Improvements | Design/Construction | Route site |
| A82 | Torlundy to Spean Bridge Signing Improvements | Design/Construction | Other collision investigation |
| A82 | Shore Street Roundabout Signing and Road Marking Review | Design/Construction | Stakeholder engagement |
| A82 | A82 Creag nan Eun | Design | Cluster site |
| A82 | Fort Augustus Pedestrian Video Survey | Investigation | Cluster site |
| A82 | A82 Kenneth Street/Tomnahurch Street Bollards | Design/Construction | Stakeholder engagement |
| A83 | Kilmory Roundabout Safety Improvements Phase 2 | Design/Construction | Cluster site |
| A83 | Whitehouse Junction Safety | Design | Stakeholder engagement |
| A83 | North of Campbeltown Speed Management | Design | Stakeholder engagement |
| A83 | Cairndow VAS Signing | Construction | Cluster site |
| A83 | Ardrishaig to Campbeltown Bend Treatments | Design | Route site |
| A84 | Kildean and Craigforth NMU Improvements | Design | Route site |
| A84 | Kilmahog to Lochearnhead DWL Review | Design/Construction | Route site |
| A84 | Kilmahog to Lochearnhead VRS Phase 1 | Design/Construction | Route site |
| A84 | Kilmahog to Lochearnhead VRS Phase 2 | Design | Route site |
| A84 | Blair Drummond Signing Improvements | Design/Construction | Route site |
| A84 | Kincardine in Menteith Primary School Improvements | Construction | Stakeholder engagement |
| A85 | Tyndrum Junction Signing Improvements | Design/Construction | Cluster site |
| A85 | Dalmally to Taynuilt Layby Improvements | Design/Construction | Route site |
| A85 | Dunbeg VRS Phase 2 Part 2 | Design | Cluster site |
| A85 | Dunbeg NMU Crossing Point & SLR | Design | Stakeholder engagement |
| A85 | Cycle/pedestrian warning signs west of Connel | Design/Construction | Stakeholder engagement |
| A85 | Loch Lubhair VRS & Realignment (Design Only) | Design | Route Risk Scoring Tool |
| A85 | Crieff VAS | Design/Construction | Stakeholder engagement |
| A87 | Auchtertyre to Kyle Junction Direction Signing | Design/Construction | Route site |
| A87 | Auchtertyre to Kyle Route VRS Improvements | Design | Route site |
| A87 | Aultachruine & Inverinate Junction | Design/Construction | Cluster site |
| A87 | Drive on the Left Route Improvements | Design/Construction | Stakeholder engagement |
| A87 | North of Portree Concealed Access Sign | Design/Construction | Stakeholder engagement |
| A828 | A85 Connel Bridge Junction Signalisation | Design/Construction | Cluster site |
| A830 | A830 Loch nan Uamh to Arisaig VRS | Design/Construction | Route site |
| A835 | Maryburgh Roundabout to Conon Bridge Passive upgrade | Design/Construction | Route site |
| A835 | Ullapool Braes Signing Improvements | Design/Construction | Other collision investigation |
| A835 | Conon Bridge Video Conflict Study | Design | Cluster site |
| A835 | Gorston Junction & Garve Improvements | Investigation/Design /Construction | Cluster site |
| A85 | Glen Ogle VRS Phase 1 (Design) | Design | Route Risk Scoring Tool |
| A85 | Arinabea to Arrivain Railway Interface | Design/Construction | Route Risk Scoring Tool |
| A9 | SB Drumochter Duals Central Reserve VRS Phase 3 | Design/Construction | Route Risk Scoring Tool |
| A9 | SB Drumochter Duals Nearside VRS Phase 1 | Design/Construction | Route Risk Scoring Tool |
| A9 | SB Drumochter Duals Nearside VRS Phase 2 | Design | Route Risk Scoring Tool |
| A9 | NB Drumochter Duals Central Reserve VRS Phase 1 | Design/Construction | Route Risk Scoring Tool |
| A9 | NB Kessock to Tore Nearside VRS Phase 1 | Design/Construction | Route Risk Scoring Tool |
| A9 | SB Kessock to Tore Nearside VRS Phase 2 | Design/Construction | Route Risk Scoring Tool |
| A85 | Lochan Na Bi VRS | Design/Construction | Route Risk Scoring Tool |
| A82 | North of Lochybridge VRS | Design | Route site |
| ALLNW | PRIME Remedial Measures | Construction | PRIME motorcycle measures |
| A9 | B851 Ft Augustus Junction to B851 Croy junction (inc. Moy) | Investigation | Route site |
| A9 | A9 House of Bruar Junction Investigation | Investigation | Cluster site |
| A9 | A9 B9150 (Ralia) conflict investigation - after | Investigation | Cluster site |
| A9 | A9 junction A938 (Carrbridge) conflict investigation | Investigation | Cluster site |
| A9 | A822 (Inver) / A923 (Dunkeld) staggered junction - ARSR investigation | Investigation | Cluster site |
| A9 | South of Moray Firth Roundabout (Ardullie) | Investigation | Cluster site |
| A9 | Single Carriageway Crossover Prevention Review | Investigation | Cluster site |
| A9 | B9163 Findon Junction | Investigation | Cluster site |
| A9 | A897 Jct (Helmsdale) to A99 Jct (Latheron) | Investigation | Route site |
| A9 | Tore Roundabout NMUs (includes ARSR A9 North of Tore site) | Investigation | Route site |
| A9 | Dunrobin | Investigation | Cluster site |
| A9 | Ardullie to B817 Dalmore | Investigation | Route site |
| A9 | Delny Muir | Investigation | Cluster site |
| A9 | Kessock Bridge (SBD) | Investigation | Cluster site |
| A9 | Helmsdale crossing assessment | Investigation | Stakeholder engagement |
| A82 | Crianlarich to Tyndrum (High Severity Rate) | Investigation | Route site |
| A82 | A861 Corran Ferry Jct to West End R/bout, Fort William | Investigation | Route site |
| A82 | Tyndrum to Glencoe | Investigation | Route site |
| A82 | Glencoe 40mph speed limit | Investigation | Route site |
| A82 | Loch Achtriochtan to Glencoe Village (Roadside Risk investigation) | Investigation | Stakeholder engagement/Other collision investigation |
| A82 | Lomondgate to Luss (Summary Report) | Investigation | Route site |
| A82 | Ballachulish to Inchree | Investigation | Route site |
| A82 | B8004 junction at Commando Memorial to A87 Invergarry | Investigation | Route site |
| A82 | Invermoriston Speed Limit Review & Pedestrian Review | Investigation | Stakeholder engagement |
| A82 | Invermoriston to Drumnadrochit | Investigation | Route site |
| A83 | A83/A815 Junction, Cairndow | Investigation | Cluster site |
| A83 | Rubh a' Mhinidhe Beag | Investigation | Cluster site |
| A83 | Muasdale to Campbeltown | Investigation | Route site |
| A83 | Arrochar to Tarbet Speed Management | Investigation | Route site |
| A83 | Ardrishaig to Kennacraig | Investigation | Route site |
| A83 | South of Ardrishaig Speed Limit Review | Investigation | Stakeholder engagement |
| A84 | A84 Blairdrummond Conflict Study | Investigation | Route site |
| A84 | A84 Blairdrummond signing review | Investigation | Route site |
| A84 | A84 Blairdrummond collision investigation | Investigation | Route site |
| A85 | Tyndrum to A819 junction, Dalmally | Investigation | Route site |
| A85 | Taynuilt Speed Limit Review | Investigation | Stakeholder engagement |
| A85 | West of Loch Awe laybys | Investigation | Cluster site |
| A85 | A85 Dunollie Road, Oban | Investigation | Cluster site |
| A85 | Lawers, Crieff | Investigation | Cluster site |
| A85 | Methven to Gilmerton | Investigation | Route site |
| A85 | Tyndrum junction design options | Investigation | Cluster site |
| A85 | A85/A84 Jct Lochearnhead to A827 Junction, Lix Toll | Investigation | Route site |
| A85 | Crieff to PKC boundary at Derrywood (Middle) Remote layby | Investigation | Route site |
| A86 | Roybridge to A82/A86 Junction | Investigation | Route site |
| A86 | Tulloch to Roy Bridge | Investigation | Route site |
| A87 | Loch Sligachan | Investigation | Cluster site |
| A87 | Loch Garry to Bun Loyne | Investigation | Route site |
| A87 | Loch Garry to Bun Loyne | Investigation | Route Risk Scoring Tool |
| A87 | Invergarry to Loch Garry | Investigation | Route site |
| A87 | Sligachan to Peinmore | Investigation | Route site |
| A87 | Shiel Bridge to Dornie | Investigation | Route site |
| A87 | Allt Mhic Mhoriein Pedestrian Safety | Investigation | Cluster site |
| A87 | Eas a' Bhradain waterfall | Investigation | Cluster site |
| A87 | U120 Luib to U100 The Moll Junction | Investigation | Route site |
| A87 | Wrong Way Driving | Investigation | Stakeholder engagement |
| A828 | Highland Council Boundary to Ballachullish Roundabout | Investigation | Route site |
| A828 | Barcaldine Visibility Survey | Investigation | Stakeholder engagement |
| A830 | Banavie to Kinsaddle, Morar | Investigation | Route site |
| A830 | Borrodale VRS | Investigation | Other collision investigation |
| A835 | A832 Braemore Junction to Mill Street Junction | Investigation | Route site |
| ALLNW | KEEP-LEFT' Foreign Driver Signing | Investigation | Stakeholder engagement |
The following table gives details of the schemes and investigations carried out on the North West Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 2 (Safe Speeds) and Strategic Action 11 (Infrastructure/Engineering).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| A889 | Dalwhinnie 40mph speed limit (H) | Design/Construction | Stakeholder engagement |
| A82 | Clansman Hotel 40mph speed limit (H) | Design/Construction | Stakeholder engagement |
| A82 | Bridge of Orchy 40mph Speed Limit (H) | Design/Construction | Stakeholder engagement |
| A85 | Gilmerton to Crieff Speed Limit Changes TTRO (H) | Design/Construction | Stakeholder engagement |
| A87 | Dornie 40mph Speed Limit | Design/Construction | Stakeholder engagement |
| A82 | A82 Glencoe 40mph Speed Limit (H) | Design | Stakeholder engagement |
| A830 | A830 Corpach and Banavie 40mph Speed Limit (H) | Design | Stakeholder engagement |
| A9 | Latheronwheel 50mph Speed Limit Order (M) | Design | Stakeholder engagement |
| A83 | Arrochar to Tarbert 50mph Speed Limit | Design | Stakeholder engagement |
| A87 | Invergarry 30mph Speed Limit | Design | Stakeholder engagement |
| A82 | A82/A887 Invermoriston Footway & Crossing | Design | Stakeholder engagement |
| A86 | Spean Bridge Speed Limit Alterations | Design | Stakeholder engagement |
| A82 | A82 Fort William Speed Limit Order (Design only) | Design | Stakeholder engagement |
| A9 | A835 Tore Roundabout 40mph Speed Limit | Design | Stakeholder engagement |
| ALLNW | Argyll & Bute 20mph Road Markings | Design/Construction | National 20mph programme |
| ALLNW | 20mph Speed Indicating Devices | Design/Construction | National 20mph programme |
| ALLNW | PKC & Stirling 20mph Road Markings | Design/Construction | National 20mph programme |
| ALLNW | THC 20mph Area speed limit replacement measures. | Design/Construction | National 20mph programme |
The following table gives details of the schemes and investigations carried out on the North West Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 2 (Safe Speeds) and Strategic Action 1 (Speed).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| A828 | Barcaldine Traffic Management | Investigation | Stakeholder engagement |
South West Operating Company Unit
The following table gives details of the schemes and investigations carried out on the South West Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 3 (Safe Roads and Roadsides) and Strategic Action 11 (Infrastructure/Engineering).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| A77 | SRS A77 Turnberry Speed management | Design/Construction | Stakeholder engagement |
| A75 / A76 | SRS A75 at A76 Cuckoo Bridge | Design/Construction | Cluster site |
| A77 | SRS A77 Kirkoswald | Investigation/Design /Construction | Stakeholder engagement |
| A75 | SRS - A75 at B794 Haugh of Urr | Design/Construction | Stakeholder engagement |
| A82 | SRS A82 Lomondgate Roundabout | Design/Construction | Cluster site |
| M74 | SRS M74 Pier Protection (Shaws Footbridge) | Design/Construction | Proactive risk reduction scheme |
| A75 | SRS A75 Collin to Carrutherstown | Design/Construction | Stakeholder engagement |
| A75 | A75 Creetown to Newton Stewart TASC | Ongoing Maintenance | Safety Camera scheme |
| A737 | St James Interchange | Design/Construction | Route site |
| A78 | SRS - A78 Pennyburn Roundabout | Investigation | Stakeholder engagement |
| A78 | SRS - A78 B7047 to Montfode Roundabout | Investigation | Route site |
| M77 | SRS - Bellfield Interchange to M77 DBFO Boundary | Investigation | Route site |
| A725 | SRS - A725 Glasgow Road junction to Bothwell Bridge | Investigation | Route site |
| A77 | SRS - A77 Haggstone Climbing Lane to Ballantrae Bridge | Investigation | Route site |
| A76 | SRS - A76 at the C114 local road at Glenairlie Bridge Junction | Investigation | Stakeholder engagement |
| A78 | SRS - A78 Warrix Interchange | Investigation | Cluster site |
| A76 | SRS - A76 Route wide Killed and Seriously Injured (KSI) Study | Investigation | KSI Route site |
| A77 | SRS - A77 Route wide KSI Study | Investigation | KSI Route site |
| A76 | Speed Management - Closeburn | Investigation | Stakeholder engagement |
| A76 | Speed Management - Mennock | Investigation | Stakeholder engagement |
| A75 | SRS - A75 Route wide KSI Study | Investigation | KSI Route site |
| M8 | SRS - M8 J22 to J31 | Investigation | Cluster site |
| M77 | SRS - M77 Junction 1 to 2 | Investigation | Cluster site |
| A78 | SRS - A78 North of Warrix Interchange | Investigation | Cluster site |
| A78 | SRS - A78 Inverkip St - East Shaw Street to Nelson Street | Investigation | Cluster site |
| A78 | SRS A78 Monkton Roundabout | Investigation | Cluster site |
| A82 | SRS - A82 Erskine to Dunglass additional collision investigation | Investigation | Stakeholder engagement |
| A77 / A76 | SRS - A77 / A76 Bellfield Interchange | Investigation | Cluster site |
| A78 | SRS - A78 Fairlie Moor Road Junction | Investigation | Stakeholder engagement |
| A828 | SRS - A82 Renton to Stoneymollan. | Investigation | Route site |
| A78 | SRS - A78 Seamill/West Kilbride | Investigation | Route site |
| A78 | SRS - A78 East of Bullring | Investigation | Route site |
| A76 | SRS - A76 New Cumnock | Investigation | Route site |
| A75 | SRS -A75 Creebridge to B735 | Investigation | Route site |
| A737 | SRS - A737 Beith Bypass | Investigation | Route site |
| A726 | SRS - All A726 | Investigation | Route site |
| A726 | SRS - A726 Birniehill Roundabout | Investigation | Cluster site |
| A726 | SRS - A726 West Mains Road to Murray Roundabout | Investigation | Cluster site |
| M8 | SRS - M8 Junction 11 to Junction 22 Collision Investigation | Investigation | Cluster site |
| A725 | SRS - A725 Route Study | Investigation | Cluster site |
| A75 | SRS - A75 Gretna to B721 | Investigation | Stakeholder engagement |
| M74 | SRS - M74 J7 to Blackwood | Investigation | Route site |
| A725 | SRS - A725 Whitemoss Roundabout to Crossbaskets | Investigation | Route ite |
| A737 | SRS A737 Mid Risk to Mid Gavin | Investigation | Cluster site |
| A898 | SRS - A898 at A82 | Investigation | Cluster site |
| A75 | SRS - A75 A701 to A709 Lockerbie Road Roundabout | Investigation | Cluster site |
| A76 | SRS A76 Whitelayskye to Skerrington | Investigation | Route site |
| M74 | SRS- M74 Dark and Wet Study - South Section | Investigation | Other collision investigation |
| M74 | SRS M74 Wet and Dark - North Section | Investigation | Other collision investigation |
| A78 | SRS - A78 Fairlie 30mph speed limit extension | Investigation | Speed Limit review |
North East Operating Company Unit
The following table gives details of the schemes and investigations carried out on the North East Trunk Road network. These are primarily linked to the Road Safety Framework Strategic Outcome 3 (Safe Roads and Roadsides) and Strategic Action 11 (Infrastructure/Engineering).
| Route | Scheme Name | Stage(s) | Investigation Type (ARSR) |
|---|---|---|---|
| A90 | A90 Hatton from A952 Toll of Birness junction to the A975 junction | Design | Route site |
| A96/A95/A90 | SRS - 20mph project Aberdeenshire and Moray | Design | National 20mph programme |
| A92 | SRS - A92 from A913 staggered junction to five roads roundabout | Design | Route site |
| A9 | SRS - A9 from A85 Overbridge to Inveralmond Roundabout Circulatory | Design | Route site |
| A92 | SRS - A92 East Fife Regional Road west of Redhouse Roundabout | Investigation | Cluster site |
| A90 | SRS - A90 Bridgemill House Junction, North Water Bridge | Design | Cluster site |
| A90 | SRS - A90 Fowlis Junction | Design | Stakeholder engagement |
| A92 | SRS - A92 Freuchie Signalisation | Construction | Stakeholder engagement |
| A9 | SRS - A9 from the A824 Main road junction (Aberuthven) to Broxden Roundabout circulatory | Construction | Route site |
| A92 | SRS - A92 Preston to Tullis Russell 40mph Speed Limit | Construction | Stakeholder engagement |
| A96 | A96 Balloch Junction | Investigation | Cluster site |
| M90 | M90 Junction 4 Kelty Junction (A909) to Keltyburn | Investigation | Route site |
| A9 | A9 Keir Roundabout Traffic and Conflict Study | Investigation | Other collision investigation |
| A90 | A90 at A932 Lochlands Junction to A94 Glamis Junction | Investigation | Route site |
| A96 | A96 Auldearn Junction | Investigation | Cluster site |
| A96 | A96 Forres Enterprise Park Roundabout | Investigation | Stakeholder engagement |
| A96 | A96 Milton Rd, south of Allanfearn | Investigation | Cluster site |
| A9 | A9, B8033 Queen Victoria slips to Balhaldie Services | Investigation | Route site |
| A90 | A90 A85 Swallow Roundabout to A923 Coupar Angus Interchange | Investigation | Route site |
| A90 | A90 B966 Brechin Junction to River North Esk | Investigation | Route site |
| A92 | A92 New Inn Roundabout to Melville Lodges Roundabout | Investigation | Route site |
| A95 | A95 Dulnain Bridge. A938 to Inverallan Roundabout | Design | Route site |
| A96 | A96 Raigmore Interchange to B9039 Junction, Newton | Design | Route site |
| A92 | A92 Broughty Ferry Road. A991 junction to Greendykes Road | Design | Route site |
| A90 | A90 Forfar from northbound off slip at St Ann's to B9128 Junction | Design | Route site |
| A90 | A90 Kingsway - Spot Speed Camera | Construction | Stakeholder engagement |