17 Publications from A9 Dualling Perth to Inverness
Search
Filter by:
Type
Project
- M8 M73 M74 Motorway Improvements (10)
- A9 Dualling Perth to Inverness (8)
- Forth Replacement Crossing (1)
- A9 Pass of Birnam to Tay Crossing (1)
- A68 Pathhead to Tynehead (1)
- A702 Candymill Bend/Edmonston Brae carriageway realignment (1)
- A737 Dalry Bypass (1)
- A737 The Den Realignment (1)
- A737 Improvements at Beith (1)
- A77 Maybole Bypass (1)
Mode Of Transport
SRRB – Final Assessment of Geometric Layout of Type A Lay-bys
1 Mar 2018The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.
Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling
25 Jul 2017This report summarises the scope of the event and the reactions and comments of those who attended
Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing
26 Jun 2017The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing
A9 Dualling Update - March 2017
4 Apr 2017Welcome to the latest newsletter about the A9 Dualling programme and the work going on to deliver this major infrastructure programme.
Project newsletter - Spring 2017 - M8 M73 M74
23 Mar 2017Project update - Issue 9
Project newsletter - Autumn 2016 - M8 M73 M74
9 Sep 2016Project newsletter - Summer 2016 - M8 M73 M74
10 Jun 2016A9 Dualling Non-Motorised User (NMU) Access Strategy
27 May 2016Formalising Transport Scotland’s position in relation to NMU access arrangements
Project newsletter - Spring 2016 - M8 M73 M74
4 Mar 2016Project newsletter - Autumn 2015 - M8 M73 M74
7 Aug 2015- 1
- 2