243 Publications

Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A9(T) Ballinluig Junction Improvement

13 Jun 2017

Three years after opening evaluation report of the A9(T) Ballinluig Junction Improvement

Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A7(T) Auchenrivock

13 Jun 2017

Three years after opening evaluation report of the A7(T) Auchenrivock improvement

DMRB Stage 2 Assessment Report - A720 Sheriffhall Roundabout

6 Jun 2017

The Stage 2 assessment is now complete and has identified that Option B is the preferred option

Forward look - June 2017 - Forth Replacement Crossing

2 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

National Transport Strategy Early Engagement Consultation Survey

1 Jun 2017

The early engagement consultation survey was carried out to shape the key themes of the National Transport Strategy review and inform wider engagement. It was launched in Dec 2016 and closed in Mar 2017. This analysis of responses was produced by Lucy Robertson of Craigforth for Transport Scotland.

The Value of the Trunk Road Network to Society and the Economy in Scotland

13 Mar 2017

This report contains the results of new research that estimates the economic and societal contribution made by Scotland’s Trunk Road Network

Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing

8 Mar 2017

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Skid Resistance of Locally Sourced Aggregate

20 Feb 2017

Study to establish a methodology to determine the in-service properties (skid-resistance) of locally sourced aggregate, thereby allowing the road maintenance community access to additional sources of materials from local Scottish quarries.

Cycling Action Plan for Scotland 2017-2020

17 Jan 2017

This third iteration of the Cycling Action Plan for Scotland is the most progressive, representing six years of shared work by partners and an unshakable commitment to the 2020 vision

Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure

23 Dec 2016

Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.

Page 13 of 25