243 Publications
Type
Project
- A9 Luncarty to Pass of Birnam (10)
- Forth Replacement Crossing (9)
- A96 Dualling Inverness to Aberdeen (9)
- Aberdeen Western Peripheral Route / Balmedie to Tipperty (6)
- A9 Dualling Perth to Inverness (5)
- A96 East of Huntly to Aberdeen (5)
- A9 Pass of Birnam to Tay Crossing (3)
- M74 Completion (3)
- A876 Upper Forth Crossing at Kincardine (3)
- A68 Pathhead to Tynehead (2)
Mode Of Transport
Topic
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A9(T) Ballinluig Junction Improvement
13 Jun 2017Three years after opening evaluation report of the A9(T) Ballinluig Junction Improvement
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A7(T) Auchenrivock
13 Jun 2017Three years after opening evaluation report of the A7(T) Auchenrivock improvement
DMRB Stage 2 Assessment Report - A720 Sheriffhall Roundabout
6 Jun 2017The Stage 2 assessment is now complete and has identified that Option B is the preferred option
Forward look - June 2017 - Forth Replacement Crossing
2 Jun 2017We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project
National Transport Strategy Early Engagement Consultation Survey
1 Jun 2017The early engagement consultation survey was carried out to shape the key themes of the National Transport Strategy review and inform wider engagement. It was launched in Dec 2016 and closed in Mar 2017. This analysis of responses was produced by Lucy Robertson of Craigforth for Transport Scotland.
The Value of the Trunk Road Network to Society and the Economy in Scotland
13 Mar 2017This report contains the results of new research that estimates the economic and societal contribution made by Scotland’s Trunk Road Network
Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing
8 Mar 2017The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
Skid Resistance of Locally Sourced Aggregate
20 Feb 2017Study to establish a methodology to determine the in-service properties (skid-resistance) of locally sourced aggregate, thereby allowing the road maintenance community access to additional sources of materials from local Scottish quarries.
Cycling Action Plan for Scotland 2017-2020
17 Jan 2017This third iteration of the Cycling Action Plan for Scotland is the most progressive, representing six years of shared work by partners and an unshakable commitment to the 2020 vision
Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure
23 Dec 2016Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.