13 Publications from A9 Dualling Perth to Inverness
Search
Filter by:
Type
Project
- Forth Replacement Crossing (9)
- A9 Dualling Perth to Inverness (5)
- M8 M73 M74 Motorway Improvements (1)
- A9 Pass of Birnam to Tay Crossing (1)
- A68 Pathhead to Tynehead (1)
- A702 Candymill Bend/Edmonston Brae carriageway realignment (1)
- A737 Dalry Bypass (1)
- A737 The Den Realignment (1)
- A737 Improvements at Beith (1)
- A77 Maybole Bypass (1)
Mode Of Transport
Forth Replacement Crossing Project - One Year After Opening Evaluation
10 Dec 2020A report on the findings of the Forth Replacement Crossing Project One Year After Opening evaluation.
Lessons Learned from the Forth Replacement Crossing Project 2007 to 2017
16 Oct 2020Noting the extent and scale of the work required to complete each stage of the Forth Replacement Crossing project.
SRRB – Final Assessment of Geometric Layout of Type A Lay-bys
1 Mar 2018The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.
Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling
25 Jul 2017This report summarises the scope of the event and the reactions and comments of those who attended
Forward look - July 2017 - Forth Replacement Crossing
27 Jun 2017We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project
Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing
26 Jun 2017The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing
Forward look - June 2017 - Forth Replacement Crossing
2 Jun 2017We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project
Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing
8 Mar 2017The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
Traffic Monitoring Annual Report - 2014/15 - Forth Replacement Crossing
23 Jun 2016The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
A9 Dualling Non-Motorised User (NMU) Access Strategy
27 May 2016Formalising Transport Scotland’s position in relation to NMU access arrangements
- 1
- 2