9 Publications from A9 Dualling Perth to Inverness

Public Inquiry documents - July 2019 - Tomatin to Moy - A9 Dualling

9 Jul 2019

A list of all relevant material to do with the Orders and the Public Inquiry

Public exhibition materials – June 2018 – Tomatin to Moy – A9 Dualling

7 Jun 2018

Materials presented at the Public exhibitions held on 7 and 8 June 2018 for the A9 Dualling project between Tomatin and Moy

Draft Orders and Environmental Statement - Tomatin to Moy - A9 Dualling

18 May 2018

The draft Orders and Environmental Statement for the Tomatin to Moy section of the A9 Dualling programme

SRRB – Final Assessment of Geometric Layout of Type A Lay-bys

1 Mar 2018

The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.

Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling

25 Jul 2017

This report summarises the scope of the event and the reactions and comments of those who attended

Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing

26 Jun 2017

The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing

Public Information Drawings - May 17 - Tomatin to Moy - A9 Dualling

18 May 2017

Public Information Drawings for the Tomatin to Moy section of the A9 Dualling programme

A9 Dualling Non-Motorised User (NMU) Access Strategy

27 May 2016

Formalising Transport Scotland’s position in relation to NMU access arrangements

Motorway and Trunk Road Programme 2013

26 Jul 2013

Motorway and Trunk Road Programme schemes