993 Publications Filtered by Publication type: 1269, 37505

Filter by:

SQUIRE performance report - Period 13 2024/25 - Caledonian Sleeper

14 May 2025

SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.

SQUIRE performance report - Period 13 2024/25 - ScotRail

14 May 2025

SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.

SQUIRE performance report - Period twelve 2024/25 - ScotRail

28 Mar 2025

SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.

SQUIRE performance report - Period twelve 2024/25 - Caledonian Sleeper

28 Mar 2025

SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.

Disability and Transport 2023

19 Mar 2025

This publication presents findings from the Scottish Household Survey about disability and transport, as well as figures from various sources on indicators for the Accessible Travel Framework.

Cowal and Rosneath Community Needs Assessment Feedback Report

13 Mar 2025

This report highlights the key themes from the feedback that was captured from the user survey, engagement events, and from other correspondence received.

A Letter from the Minister for Agriculture and Connectivity to the chair of the Cowal Transport Forum

13 Mar 2025

Following publication of the independent Community Needs Assessment report for Cowal and Rosneath on 11 September 2024, and review of the user survey and key local stakeholder and community engagement outcomes, Transport Scotland have recommended to remove 3 return sailings a day, out of the 30 currently scheduled, on the Gourock-Dunoon ferry service.

A75 Springholm and Crocketford Improvements - Meet the Team Presentation Material

11 Mar 2025

Meet the Team Public Consultation Events are being held on 11 and 12 March 2025 to give members of the public and other stakeholders an opportunity to meet the people who will be working on the scheme and to find out about the processes that will be followed as the design and assessment work progresses.

SQUIRE performance report - Period eleven 2024/25 - Caledonian Sleeper

6 Mar 2025

SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.

SQUIRE performance report - Period eleven 2024/25 - ScotRail

6 Mar 2025

SQUIRE reports provide a general overview of rail performance for stations and trains against a set of standards.

Page 7 of 100