940 Publications Filtered by Publication type: 1269
Filter by:
SQUIRE Q1 2016-17 percentage performance figures
5 Aug 2016SQUIRE reports provide a general overview of rail performance for the year
Trial of surface dressing with SAMI: Final report
22 Jul 2016TRL was appointed by the Scottish Roads Research Board to assess an innovative road maintenance treatment being trialled by Moray Council.
Review of hydraulically bound materials for use in Scotland
22 Jul 2016Literature review to gather information on the application of hydraulically bound materials (HBM) in flexible pavements and trench reinstatements and give advice on their use in Scotland.
Cartsburn Automated Self-Cleaning Trash Screen Debris Removal Impact on Local Flood Risk Benefits
14 Jul 2016Funding towards university led research to conduct an evaluative trial to assess the performance of up to four automated trash screens installed by Inverclyde Council with a view to drafting guidance on operation and performance in Scotland.
Community newsletter June 2016 - Kincraig to Dalraddy - A9 Dualling
8 Jul 2016An update on progress on the A9 Dualling, Kincraig to Dalraddy project, as well as a look ahead to the work we will be focusing on in the coming months
Quarterly newsletter No. 4 - 2016 - AWPR
1 Jul 2016A quarterly newsletter will be available via local libraries throughout the north east
Best Practice guide for the selection of pothole repair options
29 Jun 2016Second phase of research, and two year study, to ascertain which pothole repair products and techniques are suitable for use as interim and/or permanent repairs.
Evaluation of Road Safety Scotland’s Early Years Resource June 2016
28 Jun 2016Launched in 2010, Go Safe with Ziggy is Scotland’s main road safety programme for children in their early years
Traffic Monitoring Annual Report - 2014/15 - Forth Replacement Crossing
23 Jun 2016The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
A96 Dualling Inverness to Aberdeen Preliminary Engineering Services - Non-Motorised User Strategy
13 Jun 2016The main objective of this paper is to develop a strategy for NMUs, by outlining high level principles and a hierarchy of provision considering potential usage and type