12 Publications from Forth Replacement Crossing

Draft Orders and Environmental Statement - Tomatin to Moy - A9 Dualling

18 May 2018

The draft Orders and Environmental Statement for the Tomatin to Moy section of the A9 Dualling programme

SRRB – Final Assessment of Geometric Layout of Type A Lay-bys

1 Mar 2018

The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.

Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling

25 Jul 2017

This report summarises the scope of the event and the reactions and comments of those who attended

Forward look - July 2017 - Forth Replacement Crossing

27 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing

26 Jun 2017

The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing

Forward look - June 2017 - Forth Replacement Crossing

2 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing

8 Mar 2017

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Traffic Monitoring Annual Report - 2014/15 - Forth Replacement Crossing

23 Jun 2016

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

A9 Dualling Non-Motorised User (NMU) Access Strategy

27 May 2016

Formalising Transport Scotland’s position in relation to NMU access arrangements

Traffic Monitoring Annual Report - 2013/14 - Forth Replacement Crossing

25 May 2015

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Page 1 of 2