11 Publications from A876 Upper Forth Crossing at Kincardine
Search
Filter by:
Type
Project
- A9 Dualling Perth to Inverness (8)
- A876 Upper Forth Crossing at Kincardine (3)
- A68 Pathhead to Tynehead (2)
- Forth Replacement Crossing (1)
- M8 M73 M74 Motorway Improvements (1)
- A9 Pass of Birnam to Tay Crossing (1)
- A702 Candymill Bend/Edmonston Brae carriageway realignment (1)
- A737 Dalry Bypass (1)
- A737 The Den Realignment (1)
- A737 Improvements at Beith (1)
Mode Of Transport
SRRB – Final Assessment of Geometric Layout of Type A Lay-bys
1 Mar 2018The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.
Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling
25 Jul 2017This report summarises the scope of the event and the reactions and comments of those who attended
Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing
26 Jun 2017The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge
13 Jun 2017Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)
A9 Dualling Update - March 2017
4 Apr 2017Welcome to the latest newsletter about the A9 Dualling programme and the work going on to deliver this major infrastructure programme.
Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure
23 Dec 2016Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.
A9 Dualling Non-Motorised User (NMU) Access Strategy
27 May 2016Formalising Transport Scotland’s position in relation to NMU access arrangements
Environmental Impact Assessment - Kincraig to Dalraddy - A9 Dualling
31 Oct 2013A full Environmental Impact Assessment of the new scheme has been undertaken
Motorway and Trunk Road Programme 2013
26 Jul 2013Motorway and Trunk Road Programme schemes
A9 Dualling Programme Strategic Environmental Assessment Non-Technical Summary
24 Jul 2013Dualling the A9 represents one of the largest infrastructure projects in Scotland’s history
- 1
- 2