13 Publications from A876 Upper Forth Crossing at Kincardine
Search
Filter by:
Project
- Forth Replacement Crossing (9)
- A737 Dalry Bypass (3)
- A876 Upper Forth Crossing at Kincardine (3)
- A9 Dualling Perth to Inverness (1)
- M8 M73 M74 Motorway Improvements (1)
- A68 Pathhead to Tynehead (1)
- A702 Candymill Bend/Edmonston Brae carriageway realignment (1)
- A737 The Den Realignment (1)
- A737 Improvements at Beith (1)
- A77 Maybole Bypass (1)
Mode Of Transport
Topic
Forth Replacement Crossing Project - One Year After Opening Evaluation
10 Dec 2020A report on the findings of the Forth Replacement Crossing Project One Year After Opening evaluation.
Lessons Learned from the Forth Replacement Crossing Project 2007 to 2017
16 Oct 2020Noting the extent and scale of the work required to complete each stage of the Forth Replacement Crossing project.
Newsletter - Autumn 2019 - A737 Dalry Bypass
23 Sep 2019A newsletter outlining the current progress on the A737 Dalry Bypass
Newsletter - Winter 2017-18 - A737 Dalry Bypass
13 Feb 2018A newsletter outlining the current progress on the A737 Dalry Bypass
Forward look - July 2017 - Forth Replacement Crossing
27 Jun 2017We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge
13 Jun 2017Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)
Forward look - June 2017 - Forth Replacement Crossing
2 Jun 2017We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project
Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing
8 Mar 2017The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure
23 Dec 2016Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.
Traffic Monitoring Annual Report - 2014/15 - Forth Replacement Crossing
23 Jun 2016The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified
- 1
- 2