13 Publications from A876 Upper Forth Crossing at Kincardine
Search
Filter by:
Project
- A9 Dualling Perth to Inverness (6)
- A77 Maybole Bypass (6)
- A876 Upper Forth Crossing at Kincardine (3)
- A9 Tomatin to Moy (2)
- Forth Replacement Crossing (1)
- M8 M73 M74 Motorway Improvements (1)
- A9 Pass of Birnam to Tay Crossing (1)
- A68 Pathhead to Tynehead (1)
- A702 Candymill Bend/Edmonston Brae carriageway realignment (1)
- A737 Dalry Bypass (1)
Mode Of Transport
A77 Maybole Bypass Newsletter - Spring 2022
8 Apr 2022The fifth newsletter for the A77 Maybole Bypass project.
A77 Maybole Bypass Newsletter - Spring 2021
11 Jun 2021The fourth newsletter for the A77 Maybole Bypass project.
A77 Maybole Bypass Newsletter Winter 2020
17 Dec 2020The third newsletter for the A77 Maybole Bypass project
A77 Maybole Bypass Newsletter Spring 2020
22 May 2020The second newsletter for the A77 Maybole Bypass project
A77 Maybole Bypass Newsletter Autumn 2019
31 Oct 2019The first newsletter for the A77 Maybole Bypass project
Draft Orders and Environmental Statement - Tomatin to Moy - A9 Dualling
18 May 2018The draft Orders and Environmental Statement for the Tomatin to Moy section of the A9 Dualling programme
SRRB – Final Assessment of Geometric Layout of Type A Lay-bys
1 Mar 2018The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.
Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling
25 Jul 2017This report summarises the scope of the event and the reactions and comments of those who attended
Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing
26 Jun 2017The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge
13 Jun 2017Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)
- 1
- 2