8 Publications from A876 Upper Forth Crossing at Kincardine
Filter by:
A77 Maybole Bypass Newsletter - Spring 2022
8 Apr 2022The fifth newsletter for the A77 Maybole Bypass project.
A77 Maybole Bypass Newsletter - Spring 2021
11 Jun 2021The fourth newsletter for the A77 Maybole Bypass project.
A77 Maybole Bypass Newsletter Winter 2020
17 Dec 2020The third newsletter for the A77 Maybole Bypass project
A77 Maybole Bypass Newsletter Spring 2020
22 May 2020The second newsletter for the A77 Maybole Bypass project
A77 Maybole Bypass Newsletter Autumn 2019
31 Oct 2019The first newsletter for the A77 Maybole Bypass project
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge
13 Jun 2017Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)
Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure
23 Dec 2016Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.