2 Publications from A876 Upper Forth Crossing at Kincardine
Filter by:
Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge
13 Jun 2017Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)
Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure
23 Dec 2016Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.