17 Publications from A96 Dualling Inverness to Aberdeen

Traffic Monitoring Annual Report - 2013/14 - Forth Replacement Crossing

25 May 2015

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

6 May 2015

The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015

DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen

1 May 2015

Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.

Tier 1 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

19 Sep 2014

The first SEA Environmental Report detailing the outcome of the Tier 1 assessment was published for consultation on 25 September 2014 and the consultation closed on 6 November 2014

Strategic Business Case - September 2014 - A96 Inverness to Aberdeen

17 Sep 2014

Building on the evidence base of the Strategic Transport Projects Review, this Strategic Business case looks at the growing economic and transport demands for the A96 Inverness to Aberdeen corridor

Motorway and Trunk Road Programme 2013

26 Jul 2013

Motorway and Trunk Road Programme schemes

DMRB Stage 3 Assessment Report - Forth Replacement Crossing

16 Nov 2009

Design manual for roads and bridges Stage 3 engineering report for the Forth Replacement Crossing

Page 2 of 2