13 Publications from A96 East of Huntly to Aberdeen

DMRB Stage 2 Assessment Report – East of Huntly to Aberdeen - A96 Dualling

11 Dec 2020

Design Manual for Roads and Bridges Stage 2 Assessment for the East of Huntly to Aberdeen section of the A96 Dualling Scheme.

A96 Online Dualling at Inverurie Supplementary Study October 2020

30 Oct 2020

A supplementary study investigating varying standards of online dualling through Inverurie to determine impacts and performance in relation to the scheme objectives.

DMRB Stage 2 Early Sifting Reports – East of Huntly to Aberdeen - A96 Dualling

7 Aug 2019

DMRB Stage 2 Early Sifting Reports – East of Huntly to Aberdeen - A96 Dualling

DMRB Stage 2 Pairing Assessments – East of Huntly to Aberdeen - A96 Dualling

7 Aug 2019

DMRB Stage 2 Pairing Assessments – East of Huntly to Aberdeen - A96 Dualling

Online at Inverurie - Dualling Feasibility and Appraisal - East of Huntly to Aberdeen - A96 Dualling

15 Apr 2019

This report records the decision to de-select online dualling of the A96 through Inverurie as an option for the A96 Dualling East of Huntly to Aberdeen scheme

Sustainability Strategy - November 2016 - A96 Dualling

19 Jun 2017

Sustainability objectives have been developed to reflect the existing A96 Dualling Programme objectives, the needs of the A96 corridor and its communities, and the opportunities offered by a programme of this scale

A96 Dualling Inverness to Aberdeen Preliminary Engineering Services - Non-Motorised User Strategy

13 Jun 2016

The main objective of this paper is to develop a strategy for NMUs, by outlining high level principles and a hierarchy of provision considering potential usage and type

Post Adoption Statement - Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

26 Feb 2016

This statement is the last formal output of the SEA process for the Dualling Programme and outlines how the assessment findings and the comments received through the consultation process have been taken into account

Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen

6 May 2015

The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015

DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen

1 May 2015

Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.

Page 1 of 2