12 Publications from A96 Dualling Inverness to Aberdeen
Search
Filter by:
Type
Project
- A96 Dualling Inverness to Aberdeen (8)
- A9 Dualling Perth to Inverness (5)
- Forth Replacement Crossing (1)
- M8 M73 M74 Motorway Improvements (1)
- A9 Pass of Birnam to Tay Crossing (1)
- A68 Pathhead to Tynehead (1)
- A702 Candymill Bend/Edmonston Brae carriageway realignment (1)
- A737 Dalry Bypass (1)
- A737 The Den Realignment (1)
- A737 Improvements at Beith (1)
Mode Of Transport
A96 Online Dualling at Inverurie Supplementary Study October 2020
30 Oct 2020A supplementary study investigating varying standards of online dualling through Inverurie to determine impacts and performance in relation to the scheme objectives.
SRRB – Final Assessment of Geometric Layout of Type A Lay-bys
1 Mar 2018The purpose of this study is to investigate the implications related to changing the geometry, in particular the layout on both the merge and diverge tapers as a result of increasing the segregation island width. The findings should provide benefit not just for the A9 Dualling project, but for lay-by designs on the whole trunk road network.
Public exhibition summary report - November 2016 - Tomatin to Moy - A9 Dualling
25 Jul 2017This report summarises the scope of the event and the reactions and comments of those who attended
Environmental Baseline Report - June 2017 - A9 Pass of Birnam to Tay Crossing
26 Jun 2017The environmental baseline conditions for the A9 Dualling - Pass of Birnam to Tay Crossing
Sustainability Strategy - November 2016 - A96 Dualling
19 Jun 2017Sustainability objectives have been developed to reflect the existing A96 Dualling Programme objectives, the needs of the A96 corridor and its communities, and the opportunities offered by a programme of this scale
A9 Dualling Non-Motorised User (NMU) Access Strategy
27 May 2016Formalising Transport Scotland’s position in relation to NMU access arrangements
Post Adoption Statement - Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen
26 Feb 2016This statement is the last formal output of the SEA process for the Dualling Programme and outlines how the assessment findings and the comments received through the consultation process have been taken into account
Tier 2 SEA Environmental Report - A96 Dualling Inverness to Aberdeen
6 May 2015The second SEA Environmental Report detailing the outcome of the Tier 2 assessment was published for consultation on 11 May 2015 and closed on 22 June 2015
DMRB Stage 1 Assessment Report - A96 Dualling Inverness to Aberdeen
1 May 2015Design Manual for Roads and Bridges Stage 1 Assessment for the initial development and assessment of broadly defined improvement strategies for the upgrade of the A96 to a Category 7A all-purpose dual carriageway.
Tier 1 SEA Environmental Report - A96 Dualling Inverness to Aberdeen
19 Sep 2014The first SEA Environmental Report detailing the outcome of the Tier 1 assessment was published for consultation on 25 September 2014 and the consultation closed on 6 November 2014
- 1
- 2