10 Publications from A876 Upper Forth Crossing at Kincardine

Lessons Learned from the Forth Replacement Crossing Project 2007 to 2017

16 Oct 2020

Noting the extent and scale of the work required to complete each stage of the Forth Replacement Crossing project.

Forward look - July 2017 - Forth Replacement Crossing

27 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Scottish Trunk Road Infrastructure Project Evaluation 3YA evaluation report for A876(T) Clackmannanshire Bridge

13 Jun 2017

Three years after opening evaluation report of the A876(T) Clackmannanshire Bridge (Upper Forth Crossing)

Forward look - June 2017 - Forth Replacement Crossing

2 Jun 2017

We publish a rolling three-month programme of key construction activities across the main contracts on the Forth Replacement Crossing project

Traffic Monitoring Annual Report - 2015/16 - Forth Replacement Crossing

8 Mar 2017

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Collaborative Sensor Rotation Programme: Kincardine – Forth Road Bridge Closure

23 Dec 2016

Low cost air quality technologies monitored air quality adjacent to the A985 near to the town of Kincardine during the Forth Road Bridge closure. This report determines whether indicative air quality emissions increased as a result of the change in traffic composition on the A985 diversion route. The report concludes that there was no significant increase in levels of NO2 or PM2.5 concentrations at the Longannet Roundabout for the period of the FRB closure.

Traffic Monitoring Annual Report - 2014/15 - Forth Replacement Crossing

23 Jun 2016

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Traffic Monitoring Annual Report - 2013/14 - Forth Replacement Crossing

25 May 2015

The aim of this report is to present the traffic data collected throughout the monitoring period, to allow for key changes and trends to be identified

Motorway and Trunk Road Programme 2013

26 Jul 2013

Motorway and Trunk Road Programme schemes

DMRB Stage 3 Assessment Report - Forth Replacement Crossing

16 Nov 2009

Design manual for roads and bridges Stage 3 engineering report for the Forth Replacement Crossing